A method for testing formation pressure bearing capacity before cementing

A pressure-bearing capacity and cementing technology, which is applied in the direction of earthwork drilling and production, wellbore/well components, etc., can solve the problems of increased drilling fluid density, undiscovered formation pressure-bearing capacity inspection, and inaccurate judgment of formation pressure-bearing capacity, etc. To achieve the effect of overcoming blindness, determining scientific rationality, and improving accuracy

Active Publication Date: 2016-02-17
BC P INC CHINA NAT PETROLEUM CORP +1
View PDF6 Cites 2 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

The disadvantages of this method are as follows: Since the rheological properties of cement slurry with the same density are not the same as those of drilling fluid, empirical methods are used to estimate the density of aggravated drilling fluid and the design of cementing construction displacement, so that the pressure bearing capacity of the formation cannot be accurately judged, and it cannot be accurately guided. Cementing Construction Parameter Design
[0005] To sum up, the static test method of formation pressure bearing capacity and the dynamic test method of formation pressure bearing capacity currently adopted have deficiencies, which cannot accurately judge the pressure bearing capacity of the formation, cannot accurately guide the design of cementing construction parameters, and are difficult to meet the requirements of cementing construction
[0006] After searching, it has not been found to apply for a patent or publish a paper on the method of testing the pressure bearing capacity of the formation.

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Examples

Experimental program
Comparison scheme
Effect test

Embodiment 1

[0037] As the best implementation mode of the present invention, its steps include:

[0038] A method for testing formation pressure bearing capacity before cementing, characterized in that the steps are:

[0039] Step 1: After drilling, run the drill pipe directly to the casing shoe, design the wellhead pressurization value according to the maximum dynamic equivalent density of the annular space during cementing, gradually pressurize the wellhead, and observe the pumping volume and pressure changes. When the pressure inflection point or the wellhead pressure reaches the design value, stop the inspection immediately, record the final pressure data, and then calculate the formation pressure capacity at the casing shoe. If the formation pressure capacity does not meet the requirements, plugging operations are required. If the formation pressure capacity proceed if required

[0040] Step 2: Design the heavy drilling fluid density according to the maximum annular dynamic equivale...

Embodiment 2

[0093] Embodiment 2—specific application example

[0094] The formation pressure test method described in the present invention has been tested and verified in many wells such as Piedmont 1 Well and Piedmont 22 Well of the Xiangguosi gas storage, and achieved good test results. This test method is used to ensure that the dynamic equivalent density of the annular space does not exceed the pressure bearing capacity of the formation during cementing, realizes balanced pressure cementing, and greatly reduces the risk of lost circulation.

Embodiment 2-1

[0096] The formation pressure test method described in the present invention has been successfully applied in Well Piedmont 1 with φ339.7mm conventional casing cementing. 1.45g / cm was used in the third opening of Shanqian 1 Well 3 The drilling fluid φ444.5mm drill bit was drilled to 1539m. During the drilling process, many leakages occurred and several plugging operations were performed. Accurately judging the pressure bearing capacity of the formation after plugging is the key to achieving balanced pressure cementing and preventing The key to well leakage in construction. According to the calculation results of the cementing engineering design software, the casing shoe shall be 1.80g / cm 3 The equivalent density of the drilling fluid was 1.76g / cm2 in all wells in the second step. 3 Drilling fluid (by gradually increasing the density of the drilling fluid, each time 0.05g / cm 3, cycled for 1 week to observe the leakage situation), simulated the cementing design injection disp...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to view more

PUM

No PUM Login to view more

Abstract

The invention discloses a method for checking stratum loading capacity before well cementation. The method includes transferring drill pipes to the place of casing shoes after drilling is finished, setting well mouth pressurizing value according to maximum annular dynamic equal yield density in well cementation, pressurizing to the well mouth gradually, stopping checking when pressure at pumping pressure inflection point or at the well mouth reaches the set value, recording final pressure data, calculating stratum loading capacity at casing shoes, and performing Step 2 open hole stratum weak stratum loading capacity checking, if the stratum loading capacity meets requirements. With the method, weak stratum loading capacity can be accurately acquired, defects that stratum at upper casing shoe layer is easy to be omitted by traditional stratum loading capacity static checking methods are overcome, and blindness to confirm aggravated drilling fluid density and circulation discharge capacity by traditional stratum loading capacity static checking methods is avoided, and field operability is strong.

Description

technical field [0001] The invention relates to the technical field of petroleum and natural gas engineering, in particular to a method for testing formation pressure bearing capacity before well cementing. Background technique [0002] For pressure-sensitive formations with low pore pressure and easy leakage, accurately determining the pressure bearing capacity of the formation is helpful to scientifically design construction parameters and effectively prevent lost circulation, which is the key to ensuring cementing quality. At present, the formation pressure test methods used in well cementing at home and abroad mainly include two types: the static test method of the formation pressure capacity and the dynamic test method of the formation pressure capacity. [0003] The static test method of formation pressure bearing capacity is to test the formation pressure bearing capacity by means of wellhead pressurization. The specific steps are as follows: after running the drill ...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to view more

Application Information

Patent Timeline
no application Login to view more
Patent Type & Authority Patents(China)
IPC IPC(8): E21B49/00
Inventor 范伟华刘世彬曾凡坤冯彬刘洋冯予淇赵常青范成友聂世均吴朗
Owner BC P INC CHINA NAT PETROLEUM CORP
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Try Eureka
PatSnap group products