Junked tire vibration damping and isolating building foundation and construction method thereof
A technology of waste tires and construction method, which is applied in the fields of vibration isolation foundation and building reduction, can solve the problems of low price of waste tires, etc., and achieves the effects of increasing environmental protection benefits, wide application range and enhancing vibration reduction effect.
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0040] Embodiment 1: A kind of waste tire reduction, vibration isolation building foundation
[0041] Such as Figure 3-6 As shown, a foundation pit of 1.5m×1.5m×1.5m is excavated in the foundation directly below the design position of the building column (50cm×50cm), and the waste automobile tires with the outer diameter D of 59.61cm cut off the top side wall are pressed Figure 4 On the left, 10 layers are laid side by side. Each layer of tires is filled with excavated soil or construction waste and compacted. The gaps between the tires are filled with excavated soil and compacted to form a tire composite pile foundation. Under the load-bearing wall of the building design Lay 3 layers of tire complexes, fill the excavated material and tamp to form a strip foundation, lay 3 layers of tire complexes on the foundation surface of the building, and press Figure 4 The way on the right is arranged in a criss-cross pattern and the filler is compacted to form a tire composite raft ...
Embodiment 2
[0042] Embodiment 2: a kind of waste and old tire reduces, the construction method of vibration isolation building foundation, and its construction steps are as follows:
[0043] Excavate a 1.5m×1.5m×1.5m foundation pit at the position below the designed building column according to the design requirements of the upper part of the building and the foundation excavation conditions, and compact the surface of the foundation pit with a rolling machine;
[0044] Cut off the side wall of one side of the waste tire whose external diameter D is 59.61cm, and connect them side by side through connecting elements to form the layer unit structure of the tire composite pile foundation;
[0045] Load site excavation fill into step In each tire of the tire pile foundation layer unit described in , and roll compacted with a rolling machine, the gap between the tires is filled and compacted with the excavated foundation soil;
[0046] according to The construction method in th...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com