Technology for manufacturing gear output shaft by means of powder metallurgy
A powder metallurgy and output shaft technology, applied in the field of powder metallurgy, can solve the problems of lack of guarantee of product performance and quality, increased labor cost, covering a layer of putty, etc., to reduce production raw materials, improve product surface quality, and improve the effect of adverse effects
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Examples
Embodiment 1
[0021] A process for manufacturing a gear output shaft by powder metallurgy, comprising the following steps:
[0022] (1) Stirring: Add the basic iron powder to other formula powders and stir until evenly mixed.
[0023] (2) Forming: Send the uniformly mixed powder into the hopper of the forming machine, and press the green product through the forming mold at one time. The structure of the forming die is to eat the second punch, and the offset size is directly formed at the same time. Since the size of the offset part of the lower punch is fixed, in order to supplement the filling amount of the forming powder, the next punch is added, and the next punch is filled and top-pressed. The density of the offset part is increased, thereby increasing the bonding strength of the product. After forming, the part is ejected by the next punch to assist demoulding.
[0024] (3) Sintering: Place the green product on a carbon plate, sinter in a mesh belt sintering furnace, adjust the sinter...
Embodiment 2
[0030] In this example, except for the following conditions, others are the same as in Example 1:
[0031] Specifically, the sintering temperature of each stage is 690°C for the first stage, 790°C for the second stage, 960°C for the third stage, 1110°C for the fourth stage, 1140°C for the fifth stage, and 1140°C for the sixth stage. It takes 3.5 hours for the product green embryo to be discharged from the furnace.
Embodiment 3
[0033] In this example, except for the following conditions, others are the same as in Example 1:
[0034] Specifically, the sintering temperature of each stage is 680°C in the first stage, 780°C in the second stage, 950°C in the third stage, 1100°C in the fourth stage, 1130°C in the fifth stage, and 1130°C in the sixth stage. It takes 3.75 hours for the product green embryo to come out of the furnace from entering the furnace.
PUM

Abstract
Description
Claims
Application Information

- R&D
- Intellectual Property
- Life Sciences
- Materials
- Tech Scout
- Unparalleled Data Quality
- Higher Quality Content
- 60% Fewer Hallucinations
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2025 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com