System for deeply treating sewage in rural areas
A technology for advanced treatment and sewage, which is applied in water/sewage treatment, biological water/sewage treatment, light water/sewage treatment, etc. It can solve the problem of no effective method for sewage treatment, achieve convenient management, simple process conditions, reduce wasteful effect
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0015] An advanced sewage treatment system in rural areas, the system includes grid equipment, buffer adjustment tanks, sedimentation tanks, aeration tanks, wetland ponds, membrane bioreactor tanks, sand filters, advanced oxidation tanks, storage tanks, irrigation Use water storage wells and equipment rooms; sewage flows into the water inlet of the grille equipment through pipeline connections. The grille equipment uses two sets of grilles, set coarse grilles and fine The grid gap is 10mm, and the fine grid gap is 2mm. The water outlet of the grid equipment is connected to the water inlet of the buffer adjustment tank through the pipeline, the water outlet of the buffer adjustment tank is connected to the water inlet of the sedimentation tank through the pipeline, and the water outlet of the sedimentation tank is connected to the water inlet of the aeration tank through the pipeline, and the water flow in the pool stays The time is 10-20 minutes, the bottom of the aeration tan...
Embodiment 2
[0017] An advanced sewage treatment system in rural areas, the system includes grid equipment, buffer adjustment tanks, sedimentation tanks, aeration tanks, wetland ponds, membrane bioreactor tanks, sand filters, advanced oxidation tanks, storage tanks, irrigation Use water storage wells and equipment rooms; sewage flows into the water inlet of the grille equipment through pipeline connections. The grille equipment uses two sets of grilles, set coarse grilles and fine The grid gap is 10mm, and the fine grid gap is 2mm. The water outlet of the grid equipment is connected to the water inlet of the buffer adjustment tank through the pipeline, the water outlet of the buffer adjustment tank is connected to the water inlet of the sedimentation tank through the pipeline, and the water outlet of the sedimentation tank is connected to the water inlet of the aeration tank through the pipeline, and the water flow in the pool stays The time is 10-20min. Aeration holes are set at the botto...