A wood waste carbonization furnace
A dry distillation furnace and garbage technology, applied in special dry distillation, coke oven, petroleum industry, etc., can solve the problems of low processing efficiency, high time and energy consumption, and single use of finished carbon, so as to prolong the residence time and save energy , the effect of reducing energy pressure
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0018] see figure 1 , which is a schematic structural view of the wood waste carbonization furnace 10 of the present invention. The wood waste carbonization furnace 10 includes a furnace body 11, a conveying device 12, a feeding part 13, a discharging part 14, a heating device 15, an external gas supply device 16, a gas delivery pipe 17, a gas supply control unit 18, and a cooling device 19 .
[0019] The upper and lower ends of the furnace body 11 are respectively provided with a feed port 111 and a discharge port 112 . The conveying device 12 is located in the furnace body 11 , folds and circles from top to bottom in the furnace body 11 , and transports the garbage placed thereon from top to bottom in a high temperature environment. The feeding part 13 is a strip-shaped spiral dragon conveying device, which is connected to one end of the conveying device 12 through the feeding port 111 of the furnace body 11 . The discharge part 14 is a platform double-screw conveying dev...
Embodiment 2
[0033] The structure of the pyrolysis furnace for wood waste in this embodiment is substantially the same as that in Embodiment 1, the only difference being that the air supply control unit 18 is different. Specifically, the air supply control unit 18 includes a controller, a first control valve, a second control valve and a third control valve (not shown in the figure), and a time calculation module is provided in the controller. The first control valve is arranged on the first gas delivery pipe 1521 of the gas delivery pipe 152 and receives the signal of the controller to control its opening and closing; the second control valve is arranged on the first gas delivery pipe 17 On the first branch 171 and receive the signal of the controller to control its opening and closing; the third control valve is arranged on the second branch 172 of the gas delivery pipe 17 and receive the signal of the controller to control it; Control its opening and closing. The controller controls th...
PUM