Unlock instant, AI-driven research and patent intelligence for your innovation.

Steel wire pretreatment production line

A pretreatment and production line technology, applied in metal wire drawing, cleaning equipment for metal extrusion, metal extrusion, etc., can solve problems such as environmental pollution, increase production cost, and large floor area, so as to reduce environmental pollution and improve production Efficiency, small footprint effect

Inactive Publication Date: 2017-10-27
江阴市鑫智汇机械有限公司
View PDF5 Cites 0 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

[0002] The traditional steel wire drawing equipment is to remove the scale by pickling the wire rod in the pickling tank, then attach the boride film, and finally draw the wire through the drawing die equipment. The whole process not only consumes a large area, Moreover, the working environment is exposed to acid corrosion for a long time, which makes workers prone to occupational diseases, pollutes the environment, and reduces production efficiency.
[0003] For the traditional problems of large area, serious environmental pollution, and high labor costs, especially for environmental pollution and subsequent sewage treatment, it greatly increases the production cost of the enterprise and is not conducive to the sustainable development of the enterprise.

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • Steel wire pretreatment production line
  • Steel wire pretreatment production line
  • Steel wire pretreatment production line

Examples

Experimental program
Comparison scheme
Effect test

Embodiment Construction

[0052] see Figure 1~Figure 19 , a steel wire pretreatment production line involved in the present invention, which includes a shell pulling unit 1, a brush roller unit 2, a boronizing unit 3 and a coating unit 4 from right to left.

[0053] The shell dialing unit 1 includes a shell dialing unit frame 1.1, and two groups of shell dialing assemblies are arranged from right to left on the shell dialing unit frame 1.1, and the two groups of shell dialing assemblies are respectively arranged on a shell dialing assembly with an inclined surface for adjustment. On the bracket 1.3, the shell shifting assembly adjusting bracket 1.3 is arranged on the fastening bottom plate 1.2 of the shell shifting assembly, and the fastening bottom plate 1.2 of the shell shifting assembly is set on the shell shifting unit frame 1.1. The slope angles of the adjustment brackets 1.3 of the two shell shifting assemblies differ by 90 degrees, so that the included angle between the first group of shell shi...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

PUM

No PUM Login to View More

Abstract

The invention relates to a steel wire pre-treatment production line. The steel wire pre-treatment production line is characterized by sequentially comprising a shell pulling unit (1), a roller brushing unit (2), a boronizing unit (3) and a coating unit (4) from right to left, wherein the shell pulling unit (1) is used for bending and shell pulling of a steel wire; the roller brushing unit (2) comprises one group of straightening assembly and one group of roller brushing assembly; the straightening assembly is used for straightening the steel wire; the roller brushing assembly is used for rubbing and cleaning the surface of the steel wire; the boronizing unit (3) is used for carrying out boronizing treatment on the surface of the steel wire; and the coating unit (4) is used for coating a wire drawing lubricating powder material film on the surface of the steel wire. The steel wire pre-treatment production line has the advantages of small occupied area, reduction of environment pollution and improvement of production efficiency.

Description

technical field [0001] The invention relates to a steel wire pretreatment production line. Background technique [0002] The traditional steel wire drawing equipment is to remove the scale by pickling the wire rod in the pickling tank, then attach the boride film, and finally draw the wire through the drawing die equipment. The whole process not only consumes a large area, Moreover, the long-term acid erosion of the working environment makes workers prone to occupational diseases, pollutes the environment, and reduces production efficiency. [0003] For the traditional problems of large area, serious environmental pollution, and high labor costs, especially for environmental pollution and subsequent sewage treatment, it greatly increases the production cost of the enterprise and is not conducive to the sustainable development of the enterprise. Therefore it is particularly important to seek a steel wire pretreatment production line which is set up before the drawing of the ...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

Application Information

Patent Timeline
no application Login to View More
Patent Type & Authority Patents(China)
IPC IPC(8): B21C19/00B21C43/02B21C43/04
CPCB21C19/00B21C43/02B21C43/04
Inventor 周亚新
Owner 江阴市鑫智汇机械有限公司