Fully sealed waterproof construction method for side wall and project top surface
A construction method and fully-sealed technology, applied in basic structure engineering, earthwork drilling, building components, etc., can solve the problems of coil falling off, waterproof failure, difficult construction, etc., and achieve strong adhesion and prevent leakage. Effect
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Examples
Embodiment 1
[0043] Construction of a tunnel in Nanning City, Guangxi, in October 2013. There are yin and yang corners, gutters, deformation joints, construction joints, wall pipes and other nodes on the construction site. The Chinese patent product that was applied for and authorized on October 9, 200910114456. No. is the sealing paste in CN201210446557.9.
[0044] Firstly, the enclosure structure is leveled, and the underground engineering enclosure structure is leveled by methods such as shotcrete, cement mortar or brick walls;
[0045] Then pre-lay the waterproof membrane on the side wall and top surface of the tunnel. When laying a section or a piece of double-sided adhesive waterproof membrane, the composite nailing method is used to stick a gasket on the surface of the waterproof membrane, and then use the injection The nail gun shoots nails into the sealing gasket and waterproof membrane, and fixes them on the top surface or side wall of the project, so that the waterproof membran...
Embodiment 2
[0051] The waterproof renovation project of an air-raid shelter in Guangxi was constructed in March 2014. The air-raid shelter has been built for many years, and some walls have water seepage. The applicant adopts a fully sealed waterproof construction method for construction. The Chinese patent product that was applied for on October 9 and has been authorized, the waterproof membrane in the patent application number 200910114456.X; the node sealing paste used is the Chinese patent application submitted by the applicant on July 3, 2013, the application number It is the sealing paste in CN201310276909.5.
[0052] Firstly, the enclosure structure is leveled, and the underground engineering enclosure structure is leveled by methods such as shotcrete, cement mortar or brick walls;
[0053] Then use the dry-adhesive temporary fixation method to pre-spread waterproof membranes on the side walls and top surfaces of the air-raid shelter. First, mix the sealant and water according to t...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com