[0004] A kind of automatic brick production line in the above-mentioned prior art has the following problems in the manufacture and
actual use of the equipment: 1. As disclosed in the above-mentioned
Chinese patent application, the brick forming molds in the current production line are usually in the field The
font is placed, that is, four brick forming molds are placed in a group to perform blanking and forming at the same time. The above positioning device prevents each group of brick forming molds from advancing with the operation of the
conveyor belt through the lowering of the gear bar. The positioning of this method is After running for a period of time, the operation of the
conveyor belt and the lifting action of the positioning device will gradually produce positional errors. In addition, the placement of the brick forming mold cannot be placed in the corresponding position every time, which will also increase the positional error, which may lead to It is impossible to position each group of brick forming molds when the bar is lowered, and it may even be stuck on the upper edge of the brick forming mold when the bar is lowered. If the position of the brick forming mold cannot be correctly positioned, the material will be misplaced when
cutting. , which will directly affect the quality of colored brick molding, and the positioning device only blocks and locates in front of the advancing direction of each group of brick forming molds, and there is no limited position on both sides, which will also lead to a
lateral offset The position will also lead to the
dislocation of the blanking. In addition, the existing positioning device has a large mechanical structure, and the structure of the frame and rod is complicated, and it is prone to failure; The
discharge hole,
material storage hole and
discharge hole in the blanking device should be set up in four groups corresponding to the four brick forming molds, and the
discharge hole,
material storage hole and discharge hole in the blanking device are circular holes. , to achieve the ratio of the amount of blanking, usually four circular holes are arranged in each group, and each group must be set within the range of a brick forming mold, and the gap between the discharge hole, the filling hole and the blanking hole must be made Corresponding and staggered positional relationship requirements, such a circular hole setting
layout is very limited, if you want to increase the amount of
cutting, you need to increase the
diameter of each hole, because the position is cramped to meet the above requirements, it is difficult to make adjustments, a slight adjustment It may make it impossible for the filling hole to realize the completely staggered positional relationship with the discharging hole and the feeding hole during the movement, so that there will be no quantitative amount of feeding and material leakage, which will affect the color of the colored bricks. Quality requirements and waste of materials; 3. Whether it is the
slurry of the
pigment layer or the
slurry of the concrete layer, there will be some dripping after each
cutting. It is more troublesome on the edge of the brick or on the
conveyor belt. If the dripping on the edge of the brick forming mold is not disposed of in time, the
slurry in the brick forming mold may be connected together, so that the formed colored brick is unqualified and returned. It needs to be treated, if it drips on the conveyor belt, if it is not treated in time, it will condense into lumps on the conveyor belt, forming many lumps on the surface of the conveyor belt, and the uneven surface will affect the placement of the front brick forming mold and the subsequent slurry The vibration is flat, which will eventually affect the quality of colored brick molding