Ash concrete hollow wallboard and production method thereof
A technology of ash concrete and hollow wall panels, which is applied to building components, building materials, construction, etc., can solve the problems of less industrial waste and the inability to guarantee the performance of wall panels, and achieve short production time, short curing time and high quality. light effect
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0020] Embodiment 1: the production method of cinder concrete hollow wallboard, comprises the following steps:
[0021] a. Take 30% of the slag and pulverize it into powder, and pass it through a 10mm sieve for later use;
[0022] b. Mixing: When the temperature is above 0°C, mix evenly with 23% cement, 3% fly ash, 35% crushed stone and 9% stone powder, add 1 / 20 of the total weight of raw materials, and continue mixing After stirring, it is transported to the extrusion molding machine, and is extruded by mechanical vibration on the pallet to form a hollow wall slab;
[0023] c: Primary curing: the hollow wall slabs are subjected to synchronous cutting, secondary trimming, stacking, and inspection to obtain qualified hollow wall slabs, which are sent to the initial setting curing room for 12~48 hours of initial setting curing;
[0024] d. Secondary curing: separate the supporting plate from the qualified hollow wall slab, bundle and pack it, and then naturally cure it for 28 d...
Embodiment 2
[0025] Embodiment 2: the production method of cinder concrete hollow wallboard, comprises the following steps:
[0026] a. Take 38% of the slag and pulverize it to powder, and pass through a 10mm sieve for subsequent use;
[0027] b. Mixing: When the temperature is above 0°C, mix evenly with 20% cement, 19% crushed stone and 23% stone powder, add 1 / 15 of the total weight of raw materials in water, continue mixing and stirring, and transport to extrusion In the forming machine, the hollow wall slab is formed by mechanical vibration and extrusion on the pallet;
[0028] c: Primary curing: the hollow wall slabs are subjected to synchronous cutting, secondary trimming, stacking, and inspection to obtain qualified hollow wall slabs, which are sent to the initial setting curing room for 12~48 hours of initial setting curing;
[0029] d. Secondary curing: separate the supporting plate from the qualified hollow wall slab, bundle and pack it, and then naturally cure it for 28 days to ...
Embodiment 3
[0030] Embodiment 3: the production method of ash slag concrete hollow wallboard, comprises the following steps:
[0031] a. Get 73% of the slag and pulverize it into powder, and pass it through a 10mm sieve for subsequent use;
[0032] b. Mixing: When the temperature is above 0°C, mix evenly with 14% cement and 13% gravel, add 1 / 15 water of the total weight of raw materials, continue mixing and stirring, and then transport it to the extrusion molding machine. Extruded by mechanical vibration on the pallet to form a hollow wall slab;
[0033] c: Primary curing: the hollow wall slabs are subjected to synchronous cutting, secondary trimming, stacking, and inspection to obtain qualified hollow wall slabs, which are sent to the initial setting curing room for 12~48 hours of initial setting curing;
[0034] d. Secondary curing: separate the supporting plate from the qualified hollow wall slab, bundle and pack it, and then naturally cure it for 28 days to obtain the finished produc...