Bath solution stability control system
A technology of stability control and bath liquid, applied in anodizing, electrolytic coating, surface reaction electrolytic coating, etc., can solve the problem of insufficient water control time, affecting the composition of the next bath liquid, increasing the amount of medicine added and the water consumption per ton of material, etc. problems, to achieve the effect of accurate control of water control time, convenient waste liquid treatment, and reduction of pollution
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0026] Such as Figures 1 to 3 As shown, a kind of bath liquid stability control system of the present invention comprises the surface treatment system 1 that is made up of a plurality of process tanks 11 arranged in a straight line in turn, the trolley track 2 that is arranged in parallel above the surface treatment system 1, and by power The crane 3 driven by the mechanism and able to walk on the trolley track 2, the crane braking device 33 that can stop the crane 3 on the trolley track 2, also includes a PLC controller 4, between every two process tanks 11 A waste liquid tank 12 is also provided, and the trolley track 2 is also provided with a first travel switch 51 to determine the stop position of the crane 3. The first travel switch 51 is located above the waste liquid tank 12, and the PLC controller 4 is connected with the brake device of the crane respectively. 33. The first travel switch 51 is connected to the time relay 7, the trolley track 2 is a single beam bridge ...
Embodiment 2
[0034] Such as Figures 3 to 5 As shown, a kind of bath liquid stability control system of the present invention, trolley track 2 is double-girder bridge type, and the two ends of crane 3 are respectively slidably arranged above the double-girder track, and crane 3 is driven by the power mechanism to be able to move on the double-girder bridge type track. Traveling upwards, the crane 3 lifts the aluminum profile in the middle of the double-girder track through the flexible member 31. The first travel switch 51 is a normally closed switch and is set on the outer side of the upper end of the trolley track 2 near the crane 3. When the first travel switch 51 is not working Do not hinder the crane 3 from walking along the trolley track 2.
[0035]The other structures of the second embodiment are the same as those of the first embodiment, and the working methods are also the same, so no more details are given here.
Embodiment 3
[0037] Such as Figure 6 , 7 As shown, on the basis of Embodiment 1, a bath stability control system of the present invention also includes two parallel cart tracks 8, and the two ends of the trolley rails 2 are slidably arranged on the two cart rails 8 respectively. , and the trolley track 2 is driven by the power mechanism to walk on the trolley track 8, and the trolley track 2 is controlled by the trolley track braking device 21 and can stop on the trolley track 8. The system includes multiple surfaces arranged parallel to the trolley track 2 Treatment system 1, a waste liquid tank 13 is arranged between every two surface treatment systems 1, and a second travel switch 52 is also provided on the cart track 8 to determine the stop position of the trolley track 2, and the second travel switch 52 is located parallel to On the cart track 8 above the waste liquid tank 13, the second travel switch 52 and the trolley track braking device 21 are respectively connected to the PLC c...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com