A method of manufacturing a focused super-long rear anchor beam
A production method and focused technology, applied in bridges, bridge materials, bridge construction, etc., can solve problems affecting the durability of anchorage systems, concrete stress concentration, concrete cracking, etc., to ensure strength, reduce cumulative errors, reduce The effect of welding deformation
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment
[0020] The manufacturing method of the focused super-long rear anchor beam in this embodiment includes the following steps:
[0021] (1) Groove unit 1 unit production: such as figure 2 As shown, the upper cover 11, lower cover 12, web 13, horizontal longitudinal rib 14 and vertical stiffener 15 are prepared first, and then the upper cover 11, lower cover 12, web 13, horizontal Longitudinal ribs 14 and vertical stiffeners 15 are leveled, and the flatness is strictly controlled to be ≤0.3mm. Then, the web 13 is marked to draw a longitudinal center line, that is, the horizontal longitudinal rib position line. Draw a mid-span line perpendicular to the longitudinal center line, then assemble the upper and lower cover plates and webs on the platform, initially form a groove, and assemble the assembled upper cover plate 11, web plate 13, and lower cover plate 12 Weld with the web 13; then assemble and weld the horizontal longitudinal rib 14 along the position line of the horizontal...
PUM
Login to View More Abstract
Description
Claims
Application Information
Login to View More 


