Patents
Literature
Patsnap Copilot is an intelligent assistant for R&D personnel, combined with Patent DNA, to facilitate innovative research.
Patsnap Copilot

55results about How to "Make a smooth transition" patented technology

Processing technique for top surface of rail

The invention relates to a processing technique for the top surface of a rail, which is implemented by the following process flows: primary baiting; saw cutting; press molding; secondary baiting; aligning; milling a compressed section rail base; fine tuning; drilling; milling blot grooves of the rail base and rail web; milling a working edge and a non-working edge of a rail head; milling a rail top and derating; quenching; and leveling. The fine turning flow comprises the following steps of: firstly, leveling the rail base of the rail, ensuring that the flatness of the rail base is less than or equal to 0.5mm; secondly, obtaining the relative altitude difference of the rail base, a rail top surface and two sides of the rail head, detecting the straightness of the two sides of the compressed section rail head and the straightness of the rail top surface by using a leveling ruler, ensuring that an idle line between the two sides of the molded section rail head and raw materials of the rail is 1mm, and the top surface of the molded section rail is 1.5mm higher than the top surface of the raw materials of the rail; and finally, detecting the 1:40 inclination of a heal end and the altitude difference of the rail base by using an altitude difference testing tool and 1:40 inclined testing equipment. According to the processing technique, a novel copying tool is used for machining the rail top surface of the 60D40 rail, so the molded section and a transition section are in smooth transition with the raw materials; the fitting degree of the machined top surface of the 60D40 rail is more complete; and the machining accuracy of the products is guaranteed.
Owner:CHINA RAILWAY BAOJI BRIDGE GRP

Vertical seam type fishway with bifurcation sections

InactiveCN103835271AImprove water flow structureWide open spaceBarrages/weirsEngineeringWater level
The invention relates to a vertical seam type fishway with bifurcation sections. The vertical seam type fishway with the bifurcation sections comprises a main section and the bifurcation sections enabling the fishway to be bifurcated, wherein the bifurcation sections are parallel with the main section, and the main section and the bifurcation sections are connected through bifurcation pools with horizontal pool bottoms. Each bifurcation pool comprises a main section bifurcation port and a bifurcation section bifurcation port, wherein the main section bifurcation port is parallel with the bifurcation section bifurcation port. A rectification guide plate is further arranged in each bifurcation pool, and gates are arranged in the pools adjacent to the main section bifurcation ports and the bifurcation section bifurcation ports. According to the vertical seam type fishway with the bifurcation sections, the bifurcation sections are arranged at the upstream and the downstream, and the gates of the bifurcation sections are opened and closed properly in the period when the water level is relatively stable, so that fishes can go in and out of the fishway conveniently according to the needs. The rectification guide plate is properly arranged in each bifurcation pool, the water flow structure in each bifurcation pool is obviously improved, and smooth transition from the bifurcation sections to the main section is achieved. The bifurcation pools provide a wide rest space for fishes, have the functions as a rest pool, and help the fishes recover strength in the upstream sailing process.
Owner:CHINA INST OF WATER RESOURCES & HYDROPOWER RES

Rigid-flexible base double-slope transition structure and construction method thereof

The invention discloses a rigid-flexible base double-slope transition structure and a construction method thereof. The rigid-flexible base double-slope transition structure is characterized by being sequentially provided with a cement stabilized crushed stone lower base, a graded crushed stone lower base, a graded crushed stone upper base and a cement stabilized crushed stone upper base from bottom to top; a geotechnical grille is arranged between the graded crushed stone lower base and the graded crushed stone upper base; an upper surface of the cement stabilized crushed stone upper base is sequentially provided with a lower surface layer, a middle surface layer and an upper surface layer from bottom to top; and a first slope transition section and a second slope transition section are arranged in a longitudinal section of the transition structure separately, a structural steel frame is arranged according to an outer contour shape of the graded crushed stone upper base, and the graded crushed stone upper base is laid in a frame of the structural steel frame. According to the rigid-flexible base double-slope transition structure and the construction method, good transition from a semi-rigid base to a flexible base, including from a rigid base to the flexible base, can be realized, the structure is stable, and the engineering quality can be effectively improved.
Owner:HEFEI UNIV OF TECH

Medium-low-speed magnetic levitation single line excavation section independent pier column type bearing rail beam transition section structure

The invention belongs to the technical field of medium-low-speed magnetic levitation traffic engineering low lines and discloses a medium-low-speed magnetic levitation single line excavation section independent pier column type bearing rail beam transition section structure which comprises pile base bearing structures, reinforced concrete bearing rail beam bottom plates, reinforced concrete beam type structures, backfill filler on the two sides of bearing rail beams, bridge abutments and end walls. The multiple pile base bearing structures are arranged. The top end of each pile base bearing structure is connected with the corresponding reinforced concrete bearing rail beam bottom plate in a bearing manner. The top end of each reinforced concrete bearing rail beam bottom plate is connected with the corresponding reinforced concrete beam type structure in a bearing manner. Drainage ditches are arranged beside the backfill filler on the two sides of the bearing rail beams. The sides, away from the backfill filler on the two sides of the bearing rail beams, of the drainage ditches are provided with drainage slopes. The medium-low-speed magnetic levitation single line excavation section independent pier column type bearing rail beam transition section structure is better in long-term stability, capable of meeting the high requirement for bearing rail beam structure deformation and post-construction settlement and capable of meeting the requirement for long-term stability, durability and controllability of construction quality of a foundation bed, and smooth transition of a magnetic levitation elevated structure and a low line transition section F rail is effectively achieved.
Owner:CHINA RAILWAY SIYUAN SURVEY & DESIGN GRP

Transmittance adjusting device

ActiveCN111352231ARaise the upper limit of transmittanceGuaranteed uniformityOptical elementsTransmittanceEngineering
The invention discloses a transmittance adjusting device which comprises a rotating center area and an annular structure arranged around the rotating center area. The annular structure comprises a transmittance adjusting area and a complete light transmission area; a first side edge, perpendicular to the axial direction of the rotating center area, of the transmittance adjusting area is connectedwith a third side edge, perpendicular to the axial direction of the rotating center area, of the complete light-transmitting area; a second side edge, perpendicular to the axial direction of the rotating center area, of the transmittance adjusting area is connected with a fourth side edge, perpendicular to the axial direction of the rotating center area, of the complete light-transmitting area; the transmittance adjusting area is provided with light transmitting holes arranged in an array, and the light transmitting area of the transmittance adjusting area is gradually increased in the clockwise or anticlockwise direction around the rotating center area. The invention provides a transmittance adjusting device to solve the problems that the transmittance adjusting upper limit of an existingmechanical transmittance adjusting device is limited, and continuous adjustment of transmittance cannot be achieved.
Owner:SHANGHAI MICRO ELECTRONICS EQUIP (GRP) CO LTD

Bidirectional automatic dust removal and intelligent ventilation system and bidirectional dust removing method

The invention relates to the field of ventilation systems, in particular to a bidirectional automatic dust removal and intelligent ventilation system and a bidirectional dust removing method. The bidirectional automatic dust removal and intelligent ventilation system is arranged in a communication computer room and is provided with a dust removing outlet and an air supply outlet. The bidirectional automatic dust removal and intelligent ventilation system comprises an air supply unit, a dust removing unit, a control system, an air conditioner, a mixed air supply duct, an air exhaust duct and an air hood. The air supply unit brings a micro positive pressure environment for the computer room during air supply so as to automatically exhaust hot air of the communication computer room and remove dust of a strainer at the same time; and the air supply unit brings a micro negative pressure environment for the communication computer room during air exhaust and dust removal so as to pump outdoor cold air into the communication computer room. The bidirectional automatic dust removal and intelligent ventilation system has the advantages of reducing the hardware cost of the system, and reducing the use cost and maintenance cost of the system. The air exhaust unit is not provided with an air blower, so that the failure rate of the air exhaust unit due to the damage of the air blower is reduced, the energy efficiency ratio of the whole system is improved, and the energy consumption of the whole system in normal use is reduced.
Owner:SHENZHEN ZHONGXING SINDI TECH CO LTD

Bathroom bottom case, bathroom floor and mounting method

The invention discloses a bathroom bottom case, a bathroom floor and a mounting method. The bathroom bottom case comprises a bottom plate, and the bottom plate is provided with a dry area portion, a wet area portion and a floor drain portion connected between the dry area portion and the wet area portion. Through the bathroom bottom case, the floor drain portion is arranged at the joint of the dryarea portion and the wet area portion, the horizontal plane where the upper surface of the floor drain portion is lower than the horizontal plane where the dry area portion and the wet area portion are located, gentle transition of the dry area portion and the wet area portion is achieved, no step is arranged, and requirements of different users are met; and meanwhile, a dry area slope face and awet area slope face are arranged on the upper surfaces of the dry area portion and the wet area portion correspondingly, when the bathroom bottom case is mounted, operation of carrying out slope finding treatment on the floor through cement mortar is not needed, the bathroom bottom case and the floor can be rapidly assembled, the construction period can be simplified, the construction period canbe shortened, and the situation that much garbage is generated in the construction site is avoided.
Owner:ZHEJIANG YASHA DECORATION

Processing technique for top surface of rail

The present invention relates to a processing technique for the top surface of a rail, which is implemented by the following process flows: primary baiting; saw cutting; press molding; secondary baiting; aligning; milling a compressed section rail base; fine tuning; drilling; milling blot grooves of the rail base and rail web; milling a working edge and a non-working edge of a rail head; milling a rail top and derating; quenching; and leveling. The fine turning flow comprises the following steps of: firstly, leveling the rail base of the rail, ensuring that the flatness of the rail base is less than or equal to 0.5mm; secondly, obtaining the relative altitude difference of the rail base, a rail top surface and two sides of the rail head, detecting the straightness of the two sides of the compressed section rail head and the straightness of the rail top surface by using a leveling ruler, ensuring that an idle line between the two sides of the molded section rail head and raw materials of the rail is 1mm, and the top surface of the molded section rail is 1.5mm higher than the top surface of the raw materials of the rail; and finally, detecting the 1:40 inclination of a heal end and the altitude difference of the rail base by using an altitude difference testing tool and 1:40 inclined testing equipment. According to the processing technique, a copying tool is used for machining the rail top surface of the 60D40 rail, so the molded section and a transition section are in smooth transition with the raw materials; the fitting degree of the machined top surface of the 60D40 rail is more complete; and the machining accuracy of the products is guaranteed.
Owner:CHINA RAILWAY BAOJI BRIDGE GRP

Medium-low speed maglev traffic engineering double-line filling section pile foundation support beam type rail bearing beam transition section structure

The invention belongs to the technical field of medium-low speed maglev traffic engineering low-set lines and discloses a medium-low speed maglev traffic engineering double-line filling section pile foundation support beam type rail bearing beam transition section structure. The transition section structure comprises multiple pile foundation bearing structures, a reinforced concrete support beam, reinforced concrete rail bearing beam base plates, two rows of reinforced concrete beam type structures, lower roadbed filler of a rail bearing beam, two-side backfill filler of the rail bearing beam, a bridge abutment, a trapezoid filling body and end walls, wherein the reinforced concrete beam type structures are connected to the top ends of the reinforced concrete rail bearing beam base plates in a supported mode, and the two-side backfill filler of the rail bearing beam is supported by the lower roadbed filler of the rail bearing beam. The transition section structure is higher in long-term stability, the high requirement for rail bearing beam structural deformation and post-construction settlement is met, the requirement for long-term stability, durability and construction quality controllability of a foundation bed is met, and smooth transition between a maglev elevated structure and a low-set line transition section F rail is effectively achieved.
Owner:CHINA RAILWAY SIYUAN SURVEY & DESIGN GRP

Electronic oil level sensor and control method thereof

The invention discloses an electronic oil level sensor and a control method thereof. The electronic oil level sensor is characterized in that: the output end of the sensor is provided with an analog resistance output circuit, and an output signal of the analog resistance output circuit is an analog resistance value R; the input end of the analog resistance output circuit is connected with a processor; the input end of the processor is connected with an induction signal acquisition module; the induction signal acquisition module generates an induction signal according to an oil level; the processor generates a corresponding control signal according to the induction signal; and the analog resistance output circuit outputs a corresponding analog resistance value R according to the control signal. In the control method, the analog resistance value R is determined by acquiring voltage of a collector and an emitter of a triode, and the R is changed by regulating the duty ratio of a pulse width modulation (PWM) signal. The invention has the advantages that: the circuit is simple in structure and convenient to control, the analog resistance signal is directly output, the invention is compatible with the traditional resistance scheme, the electronic oil level sensor can directly replace the traditional sliding varistor sensor, the smooth transition of an oil level detection system is realized, and the system upgrade cost is reduced.
Owner:蒋勤舟

Nickel base alloy coating smooth sucker rod with high-toughness clamping section and machining method thereof

The invention relates to a nickel base alloy coating smooth sucker rod with a high-toughness clamping section and a machining method thereof. The smooth sucker rod comprises a base material and an alloy coating located on the surface of the base material. The base material is a long and straight round rod, one end of the base material is an upset end, and the other end of the base material is a non-upset end. Starting from the non-upset end, the base material sequentially comprises a first transition section, the clamping section, a second transition section and a rod body. The alloy coating comprises a high-nickel high-toughness composite coating and a nickel base self-fluxing alloy coating. The surfaces of the first transition section, the clamping section and the second transition section of the base material are provided with texture patterns. Through the design of the base material of the smooth sucker rod, by introducing the millimeter-scale texture patterns into the surface of the clamping section of the base material and using the high-toughness nickel base alloy coating on the surface of the base material, the alloy coating smooth sucker rod with excellent toughness, wearresistance and corrosion resistance is provided, and the service life of the smooth sucker rod is remarkably prolonged.
Owner:BEIJING TECHNOLOGY AND BUSINESS UNIVERSITY

Medium-low speed maglev single-line filling section independent pier stud type rail bearing beam transition section structure

The invention belongs to the technical field of medium-low speed maglev traffic engineering low-set lines and discloses a medium-low speed maglev single-line filling section independent pier stud type rail bearing beam transition section structure. The transition section structure comprises pile foundation bearing structures, reinforced concrete rail bearing beam base plates, reinforced concrete beam type structures, lower roadbed filler of a rail bearing beam, two-side backfill filler of the rail bearing beam, a bridge abutment, a trapezoid filling body and end walls, wherein one end of each reinforced concrete rail bearing beam base plate is arranged on the bridge abutment in an overlapping mode, and the end walls are arranged on the two sides of the end, arranged on the bridge abutment in the overlapping mode, of each reinforced concrete rail bearing beam base plate respectively. The transition section structure is higher in long-term stability, the high requirement for rail bearing beam structural deformation and post-construction settlement is met, and the requirement for long-term stability, durability and construction quality controllability of a foundation bed is met. By arranging the end, close to an elevated bridge, of each reinforced concrete rail bearing beam base plate on the bridge abutment in the overlapping mode, smooth transition between a maglev elevated structure and a low-set line transition section F rail is effectively achieved.
Owner:CHINA RAILWAY SIYUAN SURVEY & DESIGN GRP

Composite bearing trail beam transition section structure of pile foundation at fill section of medium-low speed magnetic levitation singlet line

The invention belongs to the technical field of low-embedded lines of medium-low speed magnetic levitation traffic engineering and discloses a composite bearing trail beam transition section structure of pile foundation at a fill section of a medium-low speed magnetic levitation singlet line. The structure comprises first pile foundation bearing structures, pile foundation joist composite bearing structures, reinforced concrete bearing trail beam baseboards, reinforced concrete beam structures, under-bearing trail beam roadbed filler, bearing trail beam either side backfill filler, a bridge abutment, trapezoidal filling bodies and side walls. Multiple first pile foundation bearing structures are arranged; the reinforced concrete beam structures are borne on the tops of the reinforced concrete bearing trail beam baseboards; and the bearing trail beam either side backfill filler is borne by the under-bearing trail beam roadbed filler. The structure is better in long term stability, the high requirements for distortion and post-construction settlement of bearing trail beam structures are met, the requirements for long term stability and durability of foundation beds as well as controllability of construction quality are met, and the smooth transition between magnetic levitation elevated structures and F tracks at the transition sections of low-embedded lines is effectively realized.
Owner:CHINA RAILWAY SIYUAN SURVEY & DESIGN GRP

Transitionary structure of pile foundation composite separated bearing-trail beam of medium-low speed maglev double-line excavated section

The present invention belongs to the technical field of lower lines of medium-low speed maglev traffic engineering, and discloses a transitionary structure of a pile foundation composite separated bearing-trail beam of a medium-low speed maglev double-line excavated section. The transitionary structure comprises first pile foundation bearing structures, pile foundation-underpinning beam composite bearing structures, two rows of reinforced concrete bearing-trail beam bed plates, two rows of reinforced concrete beam structures, backfill fillers at two sides of the bearing-trail beam, a bridge abutment, and an end wall. A plurality of first pile foundation bearing structures are arranged; top ends of the reinforced concrete bearing-trail beam bed plates are connected to the reinforced concrete beam structures; drainage ditches are disposed beside the backfill fillers at the two sides of the bearing-trail beam, and drainage slopes are disposed at one sides, far away from the backfill fillers at the two sides of the bearing-trail beam, of the drainage ditches. The transitionary structure of a pile foundation composite separated bearing-trail beam of a medium-low speed maglev double-line excavated section is better in long-term stability, and meets the high requirements of structural distortion and post-construction settlement of the bearing-trail beam and also the requirements of the long-term stability and durability of a foundation bed and the controllability of construction quality; and with the structure, smooth transition between a maglev elevated structure and a low-line transitionary F track is effectively achieved.
Owner:CHINA RAILWAY SIYUAN SURVEY & DESIGN GRP

Tunnel vertical curve sight line induction system

ActiveCN112878232AImprove the sense of accuracy of judgmentImprove the judgment of the overall line shapeTraffic signalsRoad signsRoad traffic safetyInduction system
The invention relates to the technical field of tunnel traffic safety, and in particular relates to a tunnel vertical curve sight line induction system which is suitable for an expressway tunnel with the speed limit of 60 to 100 km/h and comprises a tunnel vertical curve road section composed of an uphill section, a variable slope section and a downhill section. The induction system for the vertical curve road section of the tunnel comprises a first high beam turning-on mark arranged 200 m in front of the starting point of the uphill section, a second high beam turning-on mark arranged at the starting point of the uphill section, belt lines and reflectors arranged on the tunnel side walls of the uphill section and the downhill section, flexible sight line induction columns which are arranged on the two sides of the uphill section road section and the two sides of the downhill section road section, and the height of the flexible sight line induction columns is gradually changed; the system further comprises a U-shaped LED self-luminous contour belt which is arranged on the whole vertical curve road section, fan-shaped reflective strip sets which are arranged on the side walls of the tunnel of the variable slope section, and variable slope point marks which are arranged at variable slope points. The segmented arrangement is adopted, and is easier to understand and execute by a driver according to a driving task and a driver factor theory.
Owner:WUHAN UNIV OF TECH

Medium-low speed maglev single-line excavation section pile foundation support beam type rail bearing beam transition section structure

The invention belongs to the technical field of medium-low speed maglev traffic engineering low-set lines and discloses a medium-low speed maglev single-line excavation section pile foundation support beam type rail bearing beam transition section structure. The transition section structure comprises pile foundation bearing structures, a reinforced concrete support beam, reinforced concrete rail bearing beam base plates, reinforced concrete beam type structures, two-side backfill filler of a rail bearing beam, a bridge abutment and end walls, wherein the reinforced concrete support beam is connected to the top end of each pile foundation bearing structure in a supported mode, the reinforced concrete beam type structures are connected to the top ends of the reinforced concrete rail bearing beam base plates in a supported mode, a first drainage ditch is arranged beside the two-side backfill filler of the rail bearing beam, and a first drainage slope is arranged on the side, away from the two-side backfill filler of the rail bearing beam, of the first drainage ditch. The transition section structure is higher in long-term stability, the high requirement for rail bearing beam structural deformation and post-construction settlement is met, the requirement for long-term stability, durability and construction quality controllability of a foundation bed is met, and smooth transition between a maglev elevated structure and a low-set line transition section F rail is effectively achieved.
Owner:CHINA RAILWAY SIYUAN SURVEY & DESIGN GRP

An induction system for tunnel vertical curve line of sight

ActiveCN112878232BEasy to judgeImprove the sense of accuracy of judgmentTraffic signalsRoad signsEngineeringStructural engineering
The invention relates to the technical field of tunnel traffic safety, in particular to a tunnel vertical curve line of sight induction system, suitable for expressway tunnels with a speed limit of 60-100km / h, including an uphill section, a slope section and a downhill section. In the vertical curve section of the tunnel, the induction system of the tunnel vertical curve section includes the sign 1 for turning on the high beam light set 200m before the starting point of the uphill section, the sign 2 for turning on the high beam light set at the starting point of the uphill section, and the sign 2 for turning on the high beam light set at the starting point of the uphill section Reflective sheets are added to the belt line of the side wall of the tunnel in the section and the downhill section, flexible sight-inducing columns with gradually changing heights are installed on both sides of the road in the uphill section and on both sides of the road in the downhill section, and U-shaped columns are installed in the entire vertical curve section. LED self-illuminating contour strips, fan-shaped reflective strips set on the side walls of the slope-changing section of the tunnel, and slope-changing point signs installed at the slope-changing points. The use of such segmented settings is based on driving tasks and driver human factor theory, and is easier for drivers to understand and implement.
Owner:WUHAN UNIV OF TECH

Vertical seam type fishway with bifurcation sections

InactiveCN103835271BEasy accessImprove water flow structureBarrages/weirsWater flowEngineering
The invention relates to a vertical seam type fishway with bifurcation sections. The vertical seam type fishway with the bifurcation sections comprises a main section and the bifurcation sections enabling the fishway to be bifurcated, wherein the bifurcation sections are parallel with the main section, and the main section and the bifurcation sections are connected through bifurcation pools with horizontal pool bottoms. Each bifurcation pool comprises a main section bifurcation port and a bifurcation section bifurcation port, wherein the main section bifurcation port is parallel with the bifurcation section bifurcation port. A rectification guide plate is further arranged in each bifurcation pool, and gates are arranged in the pools adjacent to the main section bifurcation ports and the bifurcation section bifurcation ports. According to the vertical seam type fishway with the bifurcation sections, the bifurcation sections are arranged at the upstream and the downstream, and the gates of the bifurcation sections are opened and closed properly in the period when the water level is relatively stable, so that fishes can go in and out of the fishway conveniently according to the needs. The rectification guide plate is properly arranged in each bifurcation pool, the water flow structure in each bifurcation pool is obviously improved, and smooth transition from the bifurcation sections to the main section is achieved. The bifurcation pools provide a wide rest space for fishes, have the functions as a rest pool, and help the fishes recover strength in the upstream sailing process.
Owner:CHINA INST OF WATER RESOURCES & HYDROPOWER RES

Transition section structure of pile foundation joist type rail bearing beam in excavation section of medium and low speed maglev single line

The invention belongs to the technical field of medium-low speed maglev traffic engineering low-set lines and discloses a medium-low speed maglev single-line excavation section pile foundation support beam type rail bearing beam transition section structure. The transition section structure comprises pile foundation bearing structures, a reinforced concrete support beam, reinforced concrete rail bearing beam base plates, reinforced concrete beam type structures, two-side backfill filler of a rail bearing beam, a bridge abutment and end walls, wherein the reinforced concrete support beam is connected to the top end of each pile foundation bearing structure in a supported mode, the reinforced concrete beam type structures are connected to the top ends of the reinforced concrete rail bearing beam base plates in a supported mode, a first drainage ditch is arranged beside the two-side backfill filler of the rail bearing beam, and a first drainage slope is arranged on the side, away from the two-side backfill filler of the rail bearing beam, of the first drainage ditch. The transition section structure is higher in long-term stability, the high requirement for rail bearing beam structural deformation and post-construction settlement is met, the requirement for long-term stability, durability and construction quality controllability of a foundation bed is met, and smooth transition between a maglev elevated structure and a low-set line transition section F rail is effectively achieved.
Owner:CHINA RAILWAY SIYUAN SURVEY & DESIGN GRP

Independent pier-column-type rail-beam transition section structure for medium-low speed maglev single-line filling section

The invention belongs to the technical field of medium-low speed maglev traffic engineering low-set lines and discloses a medium-low speed maglev single-line filling section independent pier stud type rail bearing beam transition section structure. The transition section structure comprises pile foundation bearing structures, reinforced concrete rail bearing beam base plates, reinforced concrete beam type structures, lower roadbed filler of a rail bearing beam, two-side backfill filler of the rail bearing beam, a bridge abutment, a trapezoid filling body and end walls, wherein one end of each reinforced concrete rail bearing beam base plate is arranged on the bridge abutment in an overlapping mode, and the end walls are arranged on the two sides of the end, arranged on the bridge abutment in the overlapping mode, of each reinforced concrete rail bearing beam base plate respectively. The transition section structure is higher in long-term stability, the high requirement for rail bearing beam structural deformation and post-construction settlement is met, and the requirement for long-term stability, durability and construction quality controllability of a foundation bed is met. By arranging the end, close to an elevated bridge, of each reinforced concrete rail bearing beam base plate on the bridge abutment in the overlapping mode, smooth transition between a maglev elevated structure and a low-set line transition section F rail is effectively achieved.
Owner:CHINA RAILWAY SIYUAN SURVEY & DESIGN GRP

Pile Foundation Composite Framed Rail Beam Transition Section Structure in Medium and Low Speed ​​Maglev Double Line Fill Section

The invention belongs to the technical field of low lines of a medium and low-speed maglev transportation project, and discloses a pile foundation composite framing type bearing rail beam transition section structure for a medium and low-speed maglev double-line fill section. The pile foundation composite framing type bearing rail beam transition section structure comprises first pile foundation bearing structures, a pile foundation joist composite bearing structure, two rows of reinforced concrete bearing rail beam bottom plates, two rows of reinforced concrete girder structures, roadbed filler under a bearing rail beam, backfill at the two sides of the bearing rail beam, a bridge abutment, a trapezoidal filling body and an end wall, wherein the plurality of first pile foundation bearing structures are available; the top ends of the reinforced concrete bearing rail beam bottom plates support the reinforced concrete girder structures; the backfill at the two sides of the bearing rail beam is supported by the roadbed filler under the bearing rail beam. The pile foundation composite framing type bearing rail beam transition section structure is better in long-term stability, not only meets the high requirements on bearing rail beam structure deformation and post-construction settlement, but also meets the requirements on long-term stability, durability and controllability of construction quality of a foundation bed, and effectively realizes smooth transition from a maglev elevated structure to an F rail of a low-line transition section.
Owner:CHINA RAILWAY SIYUAN SURVEY & DESIGN GRP
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Try Eureka
PatSnap group products