A technology of waste incineration ash and construction method, applied in sheet pile wall, foundation structure engineering, construction, etc., can solve the problems of pollution and high environmental cost, and achieve the effect of avoiding high energy consumption, large pores and good permeability
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0038] In this example, a construction method of waste incineration ash piles is used to construct composite foundations. The design pile length is 9.0m, and the pile diameter is 0.6m. The steps of the method are as follows:
[0039] a. Sink the steel pipe 2 with the concrete prefabricated pile point 1 into the foundation 3 to a depth of 9.0m to make a pile hole;
[0040] b. Mix the bacteria liquid with medium sand and waste incineration ash first, then add 0.05mol / L calcium chloride solution and mix to form a mixture;
[0041] c. Pour the mixture into the steel pipe 2 that has been submerged in the foundation in advance, and bury the grouting pipe 4 and the grouting pipe 5 in the mixture 6 during the process of pouring the mixture, and the grouting pipe 4 is buried in the center of the pile hole On the axis and the height of the bottom nozzle from the bottom of the pile hole is 3.0m, the slurry pumping pipe 5 is buried along the inner wall of the steel pipe 2 and the height o...
Embodiment 2
[0048] In this example, a construction method of waste incineration ash piles is used for the construction of composite foundations. The design pile length is 12.0m and the pile diameter is 0.5m. The steps of the method are as follows:
[0049]a. Sink the steel pipe 2 with the concrete prefabricated pile tip 1 into the foundation 3 to a depth of 12.0m to make a pile hole;
[0050] b. Mix the bacteria liquid with medium sand and waste incineration ash first, then add 0.05mol / L calcium chloride solution and mix to form a mixture;
[0051] c. Pour the mixture into the steel pipe 2 that has been submerged in the foundation in advance, and bury the grouting pipe 4 and the grouting pipe 5 in the mixture 6 during the process of pouring the mixture, and the grouting pipe 4 is buried in the center of the pile hole On the axis and the height of the bottom nozzle from the bottom of the pile hole is 4.0m, the slurry pumping pipe 5 is buried along the inner wall of the steel pipe 2 and the...
Embodiment 3
[0058] In this example, a construction method of waste incineration ash piles is used to construct drainage consolidation foundations. The design pile length is 12.0m and the pile diameter is 0.4m. The steps of the method are as follows:
[0059] a. Sink the steel pipe 2 with the concrete prefabricated pile tip 1 into the foundation 3 to a depth of 12.0m to make a pile hole;
[0060] b. Mix the bacteria liquid with medium sand and waste incineration ash first, then add 0.05mol / L calcium chloride solution and mix to form a mixture;
[0061] c. Pour the mixture into the steel pipe 2 that has been submerged in the foundation in advance, and bury the grouting pipe 4 and the grouting pipe 5 in the mixture 6 during the process of pouring the mixture, and the grouting pipe 4 is buried in the center of the pile hole On the axis and the height of the bottom nozzle from the bottom of the pile hole is 4.0m, the slurry pumping pipe 5 is buried along the inner wall of the steel pipe 2 and ...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com