Embodiment 1
[0029] The test site was selected as a coal mine gangue dump in Gujiao City, Shanxi Province. Since the gangue discharged during the coal mining process needs to be temporarily stacked, the mine built the dump in 2007, and it was abandoned in 2012. After the abandonment, it was not reclaimed and utilized. The stacking yard is in a relatively flat ditch, in an irregular rectangular shape, with a total area of 6745m2 2 . The local area is a hilly area of the Loess Plateau, with an average annual rainfall of about 440 mm and no irrigation conditions.
[0030] The specific implementation steps are as follows:
[0031] (1) Site leveling: Clean up the abandoned coal gangue stacking site, remove and transport the coal gangue left on the surface, and then clean up weeds, gravel and other sundries to achieve preliminary leveling.
[0032] (2) Site survey: Use the total station (NTS-391R10) produced by the Southern Surveying and Mapping Group to survey the abandoned site, draw a ...
Embodiment 2
[0045] The test site was selected as a coal mine gangue dump in Datong City, Shanxi Province. Since the gangue discharged during the coal mining process needs to be temporarily piled up, the mine built the dump in 2012, and it was abandoned in 2015 due to environmental protection issues, and it was not reclaimed and utilized after it was abandoned. The stacking yard is in a relatively flat ditch, in an irregular rectangular shape, with a total area of 2070m 2 (45m×46m). The local area is a rocky mountainous area with an average annual rainfall of about 400 mm and no irrigation conditions.
[0046] The specific implementation steps are as follows:
[0047] (1) Site leveling: Clean up the abandoned coal gangue stacking site, remove and transport the coal gangue left on the surface, and then clean up weeds, gravel and other sundries to achieve preliminary leveling.
[0048] (2) Site survey: Use the total station (NTS-391R10) produced by the Southern Surveying and Mapping Gro...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com