All-oil based drilling fluid and preparation method thereof
A drilling fluid, all-oil-based technology, applied in chemical instruments and methods, drilling compositions, etc., can solve the problems of lack, increased filtration loss, and high oil solubility, simplifying production processes, improving performance, Yield-enhancing effect
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0041] Put 120g of sulfur powder in a closed reaction kettle, heat it to 285°C, add 0.12g of 1-tetradecene after 40 minutes, and feed N at the same time 2 Keep the pressure at 1.0MPa. Heat 380g of asphalt with a softening point of 135.4°C in a closed raw material tank to a molten state, and pass N 2 Keep the pressure of the raw material tank at 0.8MPa, and react for 60 minutes. After the sulfur in the reactor melts and polymerizes, open the valves of the reactor and the asphalt raw material tank at the same time, spray the two liquids into the contact tower, and the molten sulfur enters from the upper part of the tower. , The molten bitumen enters from the lower part of the tower, so that the two are fully contacted in countercurrent and kept for 30 minutes. Open the discharge valve at the bottom of the contact tower, quickly spray the liquid into the quenching liquid containing 0.18g 6-chloro-1-hexanol for rapid cooling, and form uniform particles of asphalt and high-elastic...
Embodiment 2
[0044] Put 90g of sulfur powder in a closed reaction kettle, heat it to 295°C, add 0.18g of isoprene after 50 minutes, and feed N 2 Keep the pressure at 1.4MPa. Heat 410g of asphalt with a softening point of 147.6°C in a closed raw material tank to a molten state, and pass N 2 Keep the pressure of the raw material tank at 0.8MPa, and react for 55 minutes. After the sulfur in the reactor melts and polymerizes, open the valves of the reactor and the asphalt raw material tank at the same time, spray the two liquids into the contact tower, and the molten sulfur enters from the upper part of the tower. , The molten bitumen enters from the lower part of the tower, so that the two are fully contacted in countercurrent and kept for 40 minutes. Open the discharge valve at the bottom of the contact tower, quickly spray the liquid into the quenching liquid containing 0.16g of isopropanol for rapid cooling, and form uniform particles of asphalt and high elastic sulfur, which are suspende...
Embodiment 3
[0047] Put 160g of sulfur powder in a closed reaction kettle, heat it to 320°C, add 0.25g of 1-octadecene after 55 minutes, and feed N at the same time 2 Keep the pressure at 1.2MPa. Heat 340g of asphalt with a softening point of 158.4°C in a closed raw material tank to a molten state, and pass N 2 Keep the pressure of the raw material tank at 1.0MPa, and react for 90 minutes. After the sulfur in the reactor is melted and polymerized, open the valves of the reactor and the asphalt raw material tank at the same time, spray the two liquids into the contact tower, and the molten sulfur enters from the upper part of the tower. , The molten bitumen enters from the lower part of the tower, so that the two are fully contacted in countercurrent and kept for 50 minutes. Open the discharge valve at the bottom of the contact tower, quickly spray the liquid into the quenching liquid containing 0.20g of 4-chloro-1-butanol for rapid cooling, and form uniform particles of asphalt and high e...
PUM
| Property | Measurement | Unit |
|---|---|---|
| particle size | aaaaa | aaaaa |
| softening point | aaaaa | aaaaa |
| density | aaaaa | aaaaa |
Abstract
Description
Claims
Application Information
Login to View More 