Joint treatment method for fabricated building wall
A technology for building wall and node processing, which is applied to buildings, building components, building structures, etc., can solve the problems of high energy consumption, long on-site construction period, and high degree of dependence on weather, and is convenient for production and transportation. , The effect of convenient installation and construction, convenient construction and operation
Examples
Embodiment 1
[0026] A node processing method for a prefabricated building wall, comprising the following steps:
[0027] (1) Process the hoisting positioning plate with bolt holes, weld the hoisting positioning plate to the outer edge of the splicing surface of the two prefabricated building wall components at a certain distance, according to the embedded parts and prefabricated wall sleeves used Measure the length of the reserved steel bars according to the specifications, and carry out setting-out positioning, and weld several reserved steel bars on the top of the stiffeners of the lower assembly building wall components;
[0028] (2) Install and construct the prefabricated building wall components on the construction site, and the pre-buried protruding U-shaped steel bars of the pre-embedded parts of the subfabricated building wall components and the corresponding parts of the adjacent subfabricated building wall components Pre-buried protruding U-shaped steel bars for horizontal connec...
Embodiment 2
[0039] A node processing method for a prefabricated building wall, comprising the following steps:
[0040] (1) Process the hoisting positioning plate with bolt holes, weld the hoisting positioning plate to the outer edge of the splicing surface of the two prefabricated building wall components at a certain distance, according to the embedded parts and prefabricated wall sleeves used Measure the length of the reserved steel bars according to the specifications, and carry out setting-out positioning, and weld several reserved steel bars on the top of the stiffeners of the lower assembly building wall components;
[0041] (2) Install and construct the prefabricated building wall components on the construction site, and the pre-buried protruding U-shaped steel bars of the pre-embedded parts of the subfabricated building wall components and the corresponding parts of the adjacent subfabricated building wall components Pre-buried protruding U-shaped steel bars for horizontal connec...
Embodiment 3
[0056] A node processing method for a prefabricated building wall, comprising the following steps:
[0057] (1) Process the hoisting positioning plate with bolt holes, weld the hoisting positioning plate to the outer edge of the splicing surface of the two prefabricated building wall components at a certain distance, according to the embedded parts and prefabricated wall sleeves used Measure the length of the reserved steel bars according to the specifications, and carry out setting-out positioning, and weld several reserved steel bars on the top of the stiffeners of the lower assembly building wall components;
[0058] (2) Install and construct the prefabricated building wall components on the construction site, and the pre-buried protruding U-shaped steel bars of the pre-embedded parts of the subfabricated building wall components and the corresponding parts of the adjacent subfabricated building wall components Pre-buried protruding U-shaped steel bars for horizontal connec...