Bridge construction and maintenance whole-process intelligent monitoring, assessment, alarming and decision-making system and method

A technology of intelligent monitoring and decision-making system, applied in neural learning methods, input/output process of data processing, biological neural network models, etc.

Pending Publication Date: 2018-08-28
CCCC HIGHWAY BRIDNAT ENG RES CENT
View PDF7 Cites 51 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

[0005] The purpose of the present invention is to provide an intelligent monitoring, evaluation, early warning and decision-making system and method for the whole process of bridge construction and maintenance, so as to solve high-precision, high-efficiency, intelligent safety monitoring, evaluation analysis and early warning decision-making in the whole process of bridge construction and operation

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • Bridge construction and maintenance whole-process intelligent monitoring, assessment, alarming and decision-making system and method
  • Bridge construction and maintenance whole-process intelligent monitoring, assessment, alarming and decision-making system and method
  • Bridge construction and maintenance whole-process intelligent monitoring, assessment, alarming and decision-making system and method

Examples

Experimental program
Comparison scheme
Effect test

Embodiment Construction

[0067] The existing safety monitoring has low precision, low level of intelligence, weak online real-time evaluation analysis and early warning capabilities, separation of construction and maintenance monitoring information, and lack of support for new technologies such as BIM, Internet of Things and big data. In view of this, the present invention Provides a system and method for intelligent monitoring, evaluation, early warning and decision-making in the whole process of bridge construction and maintenance, which has the characteristics of high precision, visualization and intelligence, and can significantly improve the technical level and efficiency of monitoring, evaluation, early warning and decision-making in the whole process of engineering construction and maintenance.

[0068] In order to make the object, technical solution and advantages of the present invention clearer, the present invention will be described in further detail below in conjunction with specific embodime...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to view more

PUM

No PUM Login to view more

Abstract

Disclosed is a bridge construction and maintenance whole-process intelligent monitoring, assessment, alarming and decision-making system and method. The bridge construction and maintenance whole-process intelligent monitoring, assessment, alarming and decision-making system is composed of an intelligent collecting module and an intelligent assessment, alarming and decision-making module, wherein the intelligent collecting module integrates laser radar three-dimensional high-precision scanning technology, building information model technology and wireless intelligent sensing technology and intelligently collects multi-source heterogeneous multi-dimensional high-precision information during a bridge construction and maintenance whole process such as environment monitoring information, structure monitoring information and project process quality safety management information; the intelligent assessment, alarming and decision-making module integrates big data processing technology, cloud computing technology, artificial neural network algorithms and virtual reality technology and structures multi-stage safety alarming indexes and emergency decision-making database to perform online, real-time, high-precision, visual and intelligent assessment analysis, alarming and decision-making on structure and traffic safety performance of the bridge construction and maintenance whole process.The bridge construction and maintenance whole-process intelligent monitoring, assessment, alarming and decision-making system covers the bridge construction and maintenance whole process and has the advantages of being high in efficiency and precision, visualized, intelligent and the like.

Description

technical field [0001] The invention relates to the field of civil engineering, in particular to a monitoring, evaluation, early warning and decision-making system and method for the whole process of bridge construction and maintenance. Background technique [0002] With the rapid development of the transportation economy, the bridge projects across rivers, straits, and deep mountains and canyons have been developed rapidly. my country has successfully built super-large bridges such as Nanpu Bridge, Sutong Yangtze River Bridge, Donghai Bridge, Hangzhou Bay Bridge, Hong Kong-Zhuhai-Macao Bridge, Baling River Bridge, and Beipanjiang Bridge. The giant super cross-sea traffic projects in the three major straits are being planned and studied. These extra-large bridge projects are huge in scale, novel in structure, and adopt many technological innovations, which have a great social impact. However, they face harsh marine environments such as deep water, typhoons, and huge waves, o...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to view more

Application Information

Patent Timeline
no application Login to view more
Patent Type & Authority Applications(China)
IPC IPC(8): G06F17/50G06N3/08G06F3/01G06Q10/06G06Q50/08
CPCG06F3/011G06N3/08G06Q10/0639G06Q50/08G06F30/23G06F30/13
Inventor 刘高张喜刚刘天成程潜陈上有李冲王昆鹏冯英骥
Owner CCCC HIGHWAY BRIDNAT ENG RES CENT
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Try Eureka
PatSnap group products