Tunnel construction method based on inverted arch and inverted arch filling layer instead of steel-concrete composite structure
A combined structure and tunnel construction technology, applied in tunnels, tunnel linings, earthwork drilling and mining, etc., can solve the problems of cast-in-place concrete lining honeycomb, many construction procedures, and low degree of mechanization
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment Construction
[0108] like figure 1 Shown is a tunnel construction method based on an inverted arch and an inverted arch filling layer instead of a steel-concrete composite structure. The tunnel secondary lining of the constructed tunnel 1 is a secondary lining for full-section support of the tunnel hole of the constructed tunnel 1 ; combine Figure 18The secondary lining of the tunnel is spliced by the arch wall lining 11 supporting the arch wall of the constructed tunnel 1 and the tunnel bottom lining located directly below the arch wall lining 11 and supporting the bottom of the constructed tunnel 1, The cross-sections of the arch wall lining 11 and the tunnel bottom lining are both arched; the tunnel bottom lining is a prefabricated inverted arch, and the prefabricated inverted arch and the steel truss structure arranged on the prefabricated inverted arch form an inverted arch. The arch and inverted arch filling layers replace the steel-concrete composite structure;
[0109] figure...
PUM
Login to View More Abstract
Description
Claims
Application Information
Login to View More 