Problems solved by technology
Method used
Examples
Embodiment 1
[0035] Take a Liansu UPVC drainage pipe with a length of 4m and Φ200mm and cut it into a length of 10cm. There are 38 pipes in total, and 18 of them are used as the outer mold of the concrete member. Pass the gravel through square hole sieves with apertures of 20mm and 25mm, and screen out gravels with a particle size of 20-25mm. Calculate the amount of gravel according to 1 / 2 of the volume of the 18 external molds, and then use the ratio of cementing material: aggregate = 1:7 (Mass ratio) Weigh ordinary 42.5 Portland cement, mix gravel and cement, add water slowly (water amount: cementing material = 0.28:1, mass ratio), stir for 5 minutes to make concrete mixture, pour the mixture into In the outer mold, vibrate and compact to 1 / 2 of the height of the outer mold to make 18 porous concrete specimens, water and cure for 7 days, and when the compressive strength of the concrete is greater than 5MPa, soak in clean water to reduce alkali , monitor the pH value in the water, change...
Embodiment 2
[0040] Take 20 Liansu UPVC drainage pipes with a height of 100mm and a diameter of 200mm, and use them as the outer mold of the concrete member. Pass the gravel through square hole sieves with apertures of 20mm and 25mm, and screen out gravels with a particle size of 20-25mm. Calculate the amount of gravel according to 1 / 2 of the volume of 20 external molds, and then use the ratio of cementing material: aggregate = 1:8 (Mass ratio) Weigh ordinary 42.5 Portland cement, mix gravel and cement, add water slowly (water amount: cement = 0.28:1, mass ratio), stir for 10 minutes to make concrete mixture, pour the mixture into In the outer mold, vibrate and compact to 1 / 2 of the height of the outer mold to make 20 porous concrete specimens, water and cure for 7 days, after the compressive strength of the concrete reaches 5MPa or more, soak in clean water to reduce alkali , monitor the pH value in the water, change the water when the pH is ≥ 10, and complete the alkali reduction after s...
PUM
| Property | Measurement | Unit |
|---|---|---|
| particle diameter | aaaaa | aaaaa |
| thickness | aaaaa | aaaaa |
| diameter | aaaaa | aaaaa |