Construction method for demolition of existing line arch bridge with upper span
Patent Information
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- THE FOURTH ENG CO LTD OF CHINA RAILWAYNO 20 BUREAU GRP
- Publication Date
- 2021-09-03
Smart Images

Figure 1 
Figure 2 
Figure 3
Abstract
Description
technical field
[0001] The invention belongs to the technical field of bridge construction, and in particular relates to a construction method for demolishing an arch bridge with an upper span existing line. Background technique
[0002] At present, my country's existing electrified railways have many additional second-line projects and renovation projects. Most of the newly-built second-line lines are built next to the existing railways. The existing railways are built with low standards. Due to planning and investment restrictions, no second-line lines are reserved. Most of the existing railway bridges on the upper span need to build new bridges and dismantle the old bridges when building the second line, so as to meet the construction needs of the new second line foundation project. When upgrading highways and municipal projects, when rerouting is limited, when upgrading highway bridges in situ, the existing bridges also need to be demolished, and when seriously diseased h...