Looking for breakthrough ideas for innovation challenges? Try Patsnap Eureka!

Construction method for demolition of existing line arch bridge with upper span

A construction method and existing line technology, applied in bridges, bridge construction, bridge maintenance, etc., can solve problems such as difficulty in implementation, lack of conditions, and difficulty in demolition, so as to ensure integrity and stability, and the hoisting process is stable. The effect of the simple structure of the hanger

Active Publication Date: 2021-09-03
THE FOURTH ENG CO LTD OF CHINA RAILWAYNO 20 BUREAU GRP
View PDF32 Cites 0 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

However, when the highway arch bridge (that is, the public-span iron arch bridge) built in the early 1970s over the existing railway line was demolished, due to the special structure of the demolished arch bridge and the lack of steel materials at that time, the arch bridge was demolished. The use of an open-hole structure consisting of plain concrete arch rings and masonry rubble pavement structures to meet the traffic needs of highways crossing railway overpasses was the mainstream and product of the times to solve the problem of crossing railway overpasses on national and rural roads at that time, but it was not possible. The overall hoisting and dismantling is very difficult, especially when the demolished arch bridge is located in a mountainous area or in a river valley, the construction site is narrow, and the overall dismantling is more difficult and basically impossible
However, when the in-situ demolition method based on the construction of temporary convenience lines is used for demolition, temporary convenience lines need to be constructed, and after the temporary convenience lines are opened, the existing railway traffic needs to be interrupted, and then the upper span bridges should be dismantled in situ. Due to constraints such as the difficulty of demolition of villager settlements along the line and the difficulty of demolition, the implementation conditions for in-situ demolition of temporary convenience lines are not available, and when the in-situ demolition of temporary convenience lines is adopted, the investment in rerouting is large
Therefore, when demolishing an arch bridge with upper spans and existing lines that cannot be temporarily rerouted because the construction site is limited, it can only be carried out in situ by using the "skylight point" for daily maintenance under the condition of ensuring that the existing operating railway transportation and driving safety are not affected. demolition construction
[0004] The in-situ demolition of the existing line arch bridge with upper span is very difficult, mainly in the following four aspects: First, the concrete arch ring has no reinforcement after radar monitoring, the arch ring is plain concrete arch ring, and the construction site site It is too narrow to support large-tonnage lifting equipment. The catenary catenary cables and wires are located in the arc of the arch ring. There are many existing equipment such as catenary pillars and optical cables on both sides of the arch bridge and the lower part of the arch bridge. The overall hoisting plain concrete arch ring is broken and damaged Most of the equipment has caused serious accident consequences, so it does not have the conditions for overall hoisting and dismantling. The blasting method is used, and the existing operating equipment is dense, and it is impossible to achieve foolproof and absolutely reliable safety protection. It is easy to cause accidents, and the conditions are not available, so it is difficult to implement; 2. The demolished masonry rubble is easy to fall into the existing railway limits, damaging the catenary and other driving equipment, and endangering the safety of traffic; because the demolished arch bridge was built in a special age, the construction personnel have a strong sense of quality, and the arch bridge The masonry structure is strong and man-made With the low demolition rate of small machinery, it cannot meet the needs of the construction period; moreover, blasting is strictly prohibited above the business line, and blasting may cause instability of other structures such as arch rings. If the demolition method is improper and biased, it is easy to cause the arch bridge to collapse and interrupt the existing railway traffic. Caused a major accident; third, the existing line crossed by the demolished arch bridge was an important transportation channel and the traffic density was high, so it was difficult to apply for the demolition construction to grow the "skylight point", and the construction could only be carried out at the "skylight point" with a maximum duration of 120 minutes. Demolition construction is a destructive behavior. In-site demolition construction must not only achieve the goal of demolishing structures, but also ensure the safety, stability and integrity of the reserved parts, and ensure the safety of driving after the site is completed; Fourth, the demolition of the arch ring The difficulty is high, because the arch ring of the demolished arch bridge is a plain concrete arch ring, and the width of the arch ring is the same as the transverse width of the demolished arch bridge. The weight of the demolition of the arch ring is quite large, and a crane of more than 300t is required. However, due to the limited construction site, large-tonnage cranes cannot enter the construction site, and because the demolished arch ring is a plain concrete arch ring, the demolition of the demolished arch ring should be carried out as a whole. During hoisting, the arch ring is prone to breakage and fall, which will damage the catenary, line rails, other underground optical cables and other driving equipment under the removed bridge and cause major accidents. Therefore, the overall removal and hoisting of the arch ring is subject to the construction site , the structural characteristics of the plain concrete arch ring itself, and other factors, it cannot be implemented; however, when the demolished arch ring is demolished by blasting method, the construction is difficult, the risk is high, and the interference to the existing railway line is very large.

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • Construction method for demolition of existing line arch bridge with upper span
  • Construction method for demolition of existing line arch bridge with upper span
  • Construction method for demolition of existing line arch bridge with upper span

Examples

Experimental program
Comparison scheme
Effect test

Embodiment Construction

[0109] like figure 1 Shown is a demolition construction method for an arch bridge with an upper span existing line, the demolished arch bridge 2 is located between the left and right side slopes 9, and the demolished arch bridge 2 is an arch bridge arranged vertically and crossing the existing railway line. See figure 2 ; The lower part of the demolished arch bridge 2 is provided with an open hole 2-1 for the existing railway line to pass through. The roof of the open hole 2-1 is arched and its left and right side walls are The vertical side wall arranged along the horizontal bridge; the roof of the open cave 2-1 is provided with an arch ring 2-3, and the arch ring 2-3 is a plain concrete arch ring and it is a demolished arch ring, so The demolished arch ring is arranged horizontally and its cross section is semicircular; the demolished arch bridge 2 is divided into the arch structure above the arch ring 2-3 and the arch structure located at the arch ring 2-3 with the arch r...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

PUM

No PUM Login to View More

Abstract

The invention discloses a construction method for dismantling an arch bridge with an upper span existing line, comprising the steps of: 1. Erection of a protective scaffold; 2. Static crushing and demolition of the blasting demolition structure on the arch; 3. Manual demolition of the blasting protective layer; 4. The demolished arch ring cutting; 5. hoisting of the arch ring to be hoisted; 6. demolition of the structure under the arch. The method of the invention is simple, reasonable in design, convenient in construction and good in use effect. While the protective scaffolds fixed on the front and rear sides of the demolished arch bridge are used for effective protection, the demolished arch bridge is repaired by a combination of static crushing and manual chiseling. The structure on the arch is removed to ensure that the static crushing process will not damage the plain concrete arch ring and will not interfere with the existing railway line crossed; after the arch ring is exposed, use a wire saw to cut and decompose the demolished arch ring Afterwards, lifting and dismantling is carried out, and then the structures under the arch on the left and right sides are quickly dismantled, which can effectively shorten the construction period, speed up the efficiency of arch bridge demolition, and the dismantling process is safe and reliable.

Description

technical field [0001] The invention belongs to the technical field of bridge construction, and in particular relates to a construction method for demolishing an arch bridge with an upper span existing line. Background technique [0002] At present, my country's existing electrified railways have many additional second-line projects and renovation projects. Most of the newly-built second-line lines are built next to the existing railways. The existing railways are built with low standards. Due to planning and investment restrictions, no second-line lines are reserved. Most of the existing railway bridges on the upper span need to build new bridges and dismantle the old bridges when building the second line, so as to meet the construction needs of the new second line foundation project. When upgrading highways and municipal projects, when rerouting is limited, when upgrading highway bridges in situ, the existing bridges also need to be demolished, and when seriously diseased h...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

Application Information

Patent Timeline
no application Login to View More
Patent Type & Authority Patents(China)
IPC IPC(8): E01D24/00
CPCE01D22/00
Inventor 张建刚李宗辉张帅孙万虎李华张利军张林肖先刘金明
Owner THE FOURTH ENG CO LTD OF CHINA RAILWAYNO 20 BUREAU GRP
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Patsnap Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Patsnap Eureka Blog
Learn More
PatSnap group products