Preparation method of prefabricated pouring type asphalt repairing material
A repairing material and pouring technology, applied in bridge materials, bridge maintenance, tracks, etc., can solve the technical problems of steel bridge deck pavement, difficult to solve, difficult maintenance, long construction period, etc., to improve road and bridge pouring paving. The quality of operation and maintenance services, the effect of improving the high temperature bearing capacity and anti-aging performance of the pavement, and the rapid opening of traffic
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0034] like Figure 4 As shown, the prefabricated pouring pit repair structure includes from bottom to top: steel plate 1, thermoplastic resin waterproof bonding layer 2, prefabricated pouring test block 3, seam hot-melt splicing 4, spreading heat radiation-anti-aging nanocomposite Material 5, high-strength crushed stone 6.
[0035] Its preparation method is as follows:
[0036] Step 1. Use the special mixer DF-8 to mix the oil-rich castable asphalt mixture for 70 minutes; then pour the mixture into a spherical stainless steel mold to prefabricate the castable test block; after cooling, demould at room temperature and store in sealed storage in the box, such as figure 2 shown.
[0037] Among them, calculated in parts by mass, the oil-rich castable asphalt mixture adopts GA-10 gradation, and the asphalt ratio is 15%; the castable cement is blended with 65 parts of 30# hard straight asphalt and 35 parts of lake asphalt The mineral materials used are basalt aggregate and lim...
Embodiment 2
[0044] like Figure 4 As shown, the prefabricated pouring pit repair structure includes from bottom to top: steel plate 1, thermoplastic resin waterproof bonding layer 2, prefabricated pouring test block 3, seam hot-melt splicing 4, spreading heat radiation-anti-aging nanocomposite Material 5, high-strength crushed stone 6.
[0045] Its preparation method is as follows:
[0046] Step 1. Use the special mixer DF-8 to mix the oil-rich castable asphalt mixture for 70 minutes; then pour the mixture into a spherical stainless steel mold to prefabricate the castable test block; after cooling, demould at room temperature and store in sealed storage in the box.
[0047] Among them, calculated in parts by mass, the oil-rich castable asphalt mixture is graded with GA-10, and the oil-stone ratio is 20%; the castable cement is blended with 75 parts of 30# hard straight asphalt and 25 parts of lake asphalt The mineral materials used are basalt aggregate and limestone powder, 2# aggregat...
Embodiment 3
[0054] like Figure 4 As shown, the prefabricated pouring pit repair structure includes from bottom to top: steel plate 1, thermoplastic resin waterproof bonding layer 2, prefabricated pouring test block 3, seam hot-melt splicing 4, spreading heat radiation-anti-aging nanocomposite Material 5, high-strength crushed stone 6.
[0055] Its preparation method is as follows:
[0056] Step 1. Use the special mixer DF-8 to mix the oil-rich castable asphalt mixture for 70 minutes; then pour the mixture into a spherical stainless steel mold to prefabricate the castable test block; after cooling, demould at room temperature and store in sealed storage in the box.
[0057] Among them, calculated in parts by mass, the oil-rich castable asphalt mixture is graded with GA-10, and the oil-stone ratio is 20%; the castable cement is blended with 75 parts of 30# hard straight asphalt and 25 parts of lake asphalt The mineral materials used are basalt aggregate and limestone powder, 2# aggregat...
PUM
| Property | Measurement | Unit |
|---|---|---|
| particle diameter | aaaaa | aaaaa |
| particle diameter | aaaaa | aaaaa |
| particle diameter | aaaaa | aaaaa |
Abstract
Description
Claims
Application Information
Login to View More 