Cold paved modified asphalt mixture and its preparation method and application
A technology of modified asphalt and mixture, applied in the direction of climate sustainability, sustainable waste treatment, solid waste management, etc., can solve the problems of short effective construction time, complicated construction procedures, low construction performance, etc., and reduce waste of resources and environmental pollution, reduce road operating costs, and improve construction ease
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1~ Embodiment 4
[0025] The cold-paved modified asphalt mixture proposed in Examples 1 to 4 includes cold-paving solvent, petroleum resin, road petroleum asphalt and mineral materials; cold-paving solvent includes viscosity reducer, catalytic cracking rubber powder and organic solvent; Mineral material is composed of coarse aggregate, fine aggregate and mineral powder.
[0026] In Examples 1 to 4, the specific parts by weight are shown in Table 1.
[0027] Table 1 The number of components of the cold-paved modified asphalt mixture of Examples 1 to 4
[0028]
[0029]
[0030] In the above-mentioned embodiment 1 to embodiment 4, 6 kinds of materials are included, and each material is as follows:
[0031] 1) The viscosity reducer is Sasobit REDUX; the performance index of Sasobit REDUX is the freezing point of 72-83°C and the permeability of 16-30dmm at 25°C.
[0032] 2) The petroleum resin is C5 hydrogenated petroleum resin. Its technical properties are shown in Table 2.
[0033] Tabl...
Embodiment 5
[0051] In this example, the raw material ratio provided in Example 1 is used to prepare the cold-paved modified asphalt mixture. Specifically, 0.394 parts of viscosity reducer, 1.313 parts of petroleum resin, 2.625 parts of catalytic cracking rubber powder, 7.876 parts of organic solvent, 26.254 parts of road petroleum asphalt, and 961.538 parts of mineral materials.
[0052] In this embodiment, the weight of the mineral powder is 3% of the weight of the mineral material.
[0053] In the present embodiment, the preparation method of cold-paved modified asphalt mixture comprises the following steps:
[0054] 1) When the temperature of the road petroleum asphalt reaches about 175°C, the catalytic cracking rubber powder is added at a constant speed, and at the same time, when the temperature of the asphalt reaches 175°C, the timing is started, and the mixer is uniformly stirred for 75 minutes;
[0055] 2) When the stirring time reaches 75min, add the viscosity reducer until it i...
Embodiment 6
[0059] In this example, the raw material ratio provided in Example 2 was used to prepare the cold-paved modified asphalt mixture. Specifically, 0.441 parts of viscosity reducer, 1.470 parts of petroleum resin, 2.939 parts of catalytic cracking rubber powder, 8.818 parts of organic solvent, 29.394 parts of road petroleum asphalt, and 956.938 parts of mineral materials.
[0060] In this embodiment, the weight of the mineral powder is 5% of the weight of the mineral material.
[0061] In the present embodiment, the preparation method of cold-paved modified asphalt mixture comprises the following steps:
[0062] 1) When the temperature of the road petroleum asphalt reaches about 183°C, the catalytic cracking rubber powder is added at a constant speed, and at the same time, when the temperature of the asphalt reaches 183°C, the timing is started, and the mixer is uniformly stirred for 55 minutes;
[0063] 2) When the stirring time reaches 55min, add the viscosity reducer until it ...
PUM
| Property | Measurement | Unit |
|---|---|---|
| freezing point | aaaaa | aaaaa |
| flash point | aaaaa | aaaaa |
| stability | aaaaa | aaaaa |
Abstract
Description
Claims
Application Information
Login to View More 


