A sustainable method for salty irrigation of farmland in arid regions based on halophyte rotation
A technology for halophytes and arid areas, applied in botany equipment and methods, soil preparation methods, plant cultivation, etc., can solve problems such as increasing water content and affecting crop growth activities
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Examples
Embodiment 1
[0025] From 2018 to 2020, the invention conducted a saltwater irrigation test on farmland in the 31st Regiment of the Second Division of the Xinjiang Production and Construction Corps:
[0026] Lot selection:
[0027] a. During the autumn rest period, choose the sandy soil farmland along the alkali discharge canal;
[0028] Laying the drain pipe:
[0029] b. First, punch 60 holes / m on the upper surface of the PVC pipe, with a hole diameter of 5mm, and then wrap the PVC pipe with a layer of geotextile after drilling. The geotextile and gravel layer are used as the outsourcing filter layer, and a ball valve is installed at the outlet of the PVC pipe;
[0030] c. Ditch the vertical alkali drainage ditch with a distance of 25m and a ditch depth of 2m. After ditching, fill 15cm of gravel with a particle size of 1cm from bottom to top, and lay the PVC pipe in step b with a diameter of 125mm on the gravel, with the perforated side facing upwards , then cover the PVC pipe with 15cm ...
Embodiment 2
[0042] From 2018 to 2020, the invention conducted a saltwater irrigation test on farmland in the 33rd regiment of the second division of the Xinjiang Production and Construction Corps:
[0043] Lot selection:
[0044] a. During the autumn rest period, choose the sandy soil farmland along the alkali discharge canal;
[0045] Laying the drain pipe:
[0046] b. First, punch 60 holes / m on the upper surface of the PVC pipe, with a hole diameter of 5mm, and then wrap the PVC pipe with a layer of geotextile after drilling. The geotextile and gravel layer are used as the outsourcing filter layer, and a ball valve is installed at the outlet of the PVC pipe;
[0047]c. Ditch the vertical alkali discharge ditch with a distance of 30m and a ditch depth of 2m. After ditching, fill 15cm of gravel with a particle size of 2cm from bottom to top, and lay the PVC pipe in step b with a diameter of 125mm on the gravel, with the perforated side facing up , then cover the PVC pipe with 15cm deep ...
PUM
Login to View More Abstract
Description
Claims
Application Information
Login to View More