Heat preservation and decoration integrated construction process for passive heat-bridge-free pitched roof with thickness of 300 mm
A construction process and sloping roof technology, which is applied to tools for roof engineering, roofing, roof covering, etc., can solve problems such as the inability to meet the requirements of the K value of the roof heat transfer coefficient, and achieve the effect of improving building energy-saving efficiency
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Examples
Embodiment 1
[0123] The integrated construction process of passive thermal bridge-free sloping roof with a thickness of 300 mm and thermal insulation and decoration provided in this example is as follows:
[0124] Base treatment → 20mm 1:3 cement mortar leveling → cold base oil → 1.5 thick aluminum foil surface self-adhesive modified asphalt vapor barrier membrane → high-density graphite polystyrene board double-layer staggered seam PU glue bonding → 3 thick SBS modification Asphalt self-adhesive waterproof membrane → geotextile → fine stone concrete nail-holding layer → fixed vertical tile strip → roof tile → completion cleaning and acceptance
[0125] Specifically, the following steps are included:
[0126] (1) Acceptance and cleaning of the base layer: Since the deviation of the flatness and compactness of the roof insulation layer largely depends on the base layer, in order to ensure the quality of the insulation project, the insulation layer is required to be laid on a solid and flat ...
Embodiment 2
[0225] (1) Bid Section 1 of Sino-British Biopharmaceutical R&D Platform Project
[0226] Qingdao Sino-British Biopharmaceutical Research and Development Platform Project first bid section passive thermal bridge 300mm thick thermal insulation and decoration integrated roof construction started in May 2019, the total construction period is 120 days, the main work content is the passive thermal bridge 300mm thick thermal insulation decoration integration Roofing construction. The thermal insulation performance is good, the building roof thermal insulation bridge loss is extremely low, the thermal imaging experiment results are good, and the other various experimental results meet the design requirements. It has been affirmed by the construction unit and has achieved good economic and social benefits.
[0227] (2) The second bid section of the Sino-British biopharmaceutical research and development platform project
[0228] The second bid section of the Sino-British biopharmaceu...
PUM
Property | Measurement | Unit |
---|---|---|
Surface strength | aaaaa | aaaaa |
Extension length | aaaaa | aaaaa |
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com