Automatic sorting method for urban plant-network-river topological relation
A topological relationship, urban technology, applied in data processing applications, special data processing applications, instruments, etc., can solve the problems of low efficiency, long time consumption, high error rate, and achieve the goal of avoiding mechanical labor, shortening inspection time, and reducing workload. Effect
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
specific Embodiment approach 1
[0039] Specific implementation mode one: refer to figure 1 Specifically explaining this embodiment, the automatic combing method of the city "factory network river" topological relationship described in this embodiment includes the following steps:
[0040] Step 1: Read pipe network data, which includes pipe section data and node data.
[0041] Pipe section data includes: pipe section name, pipe section number, pipe section category, pipe section nature, whether to participate in combing, starting point x, starting point y, starting point category, starting point inspection well invert elevation, starting point pipe section offset, end point x, end point y, end point category, end point Check the fields such as the elevation of the well invert, the offset of the end pipe section, the pipe diameter, the cross section of the pipe section, and the error and warning reminders. Wherein, the starting point x and the starting point y are the x-axis coordinate value and the y-axis co...
specific Embodiment
[0073] Combined with the actual situation, this implementation uses the python language for programming and packages it as an independent application program. The window interface displays reserved variables and operation progress results, and the specific traversal process is carried out in the background.
[0074] The data source of this embodiment is the urban "factory network and river" database formed by the basic information survey of the city "factory network and river", including pipe section data and node data. Initially, 9300 lines of pipe section data and 9410 lines of node data were read.
[0075] According to the "principal component of the pipe section to filter the critical pipe diameter" input by the user, delete the pipe section data smaller than the critical pipe diameter in the input pipe section data. In this embodiment, the deleted pipe section data is 6496 lines.
[0076] Match the node data with the pipe segment data, and delete the unmatched node data. I...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com