The old bridge ecological demolition structure and construction method
An old bridge and ecological technology, applied in the field of ecological demolition structure and construction of old bridges, can solve the problems of large environmental pollution, long construction period, large investment in large-scale mechanical crushing technology, etc., and achieve environmental protection, improve construction efficiency, and be easy to manufacture Effect
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0039]The ecological demolition structure of the old bridge includes bridge demolition crane 1, anchor rod 2, old bridge cover beam 3, old bridge pier column 4, old bridge foundation 5, hook 6, hoisting cable 7, old bridge cast-in-place slab 8 , transport vehicle 9, old bridge dismantling unit 10, guardrail dismantling stabilization device 13, pontoon crane 18, dismantling unit dividing line 19, blast hole 20, hanging hole 21, flying stone protection net 30 and mobile support protection system; The upper part of the old bridge foundation 5 is provided with an old bridge pier column 4, the upper part of the old bridge pier column 4 is provided with an old bridge cover beam 3, and an old bridge cast-in-place slab 8 is erected on the upper part of the old bridge cover beam 3; Rod 14, stable hook 15, bolt 16 and base 17, the stable hook 15 is connected to the upper end of the stable inclined rod 14, and the lower end of the stable inclined rod 14 is connected to the base 17 with bo...
Embodiment 2
[0047] The construction method of the old bridge ecological demolition system includes the following steps:
[0048] 1) as figure 2 , image 3 As shown in the figure, the demolition of the bridge deck is an auxiliary structure: the old bridge guardrail 12 is divided into sections, the guardrail removal and stabilization devices 13 are arranged at intervals on the inner side of the section guardrail, and then the old bridge guardrail 12 is cut in sequence, and is hoisted to the bridge by a car transported to the dismantling workshop for detailed dismantling;
[0049] 2) Demolish the cast-in-place slab of the old bridge in sections 8:
[0050] ①If Figure 4 As shown in the figure, the old bridge demolition unit 10 is divided: the cast-in-situ slab 8 of the old bridge is constructed, measured, laid out and marked, and the cast-in-situ slab of the old bridge 8 is divided into several sections of the old bridge demolition unit 10. On the old bridge demolition unit 10 Drill the...