Aluminum alloy for producing ladder stand pedal stick of wind power tower

A technology for wind power towers and aluminum alloys, which is applied in the field of aluminum alloy preparation, can solve the problems that the profiles cannot meet the use requirements, the ratio of alloy elements is unreasonable, and the mechanical properties and the use performance can reach the standard, the ratio is convenient, and the cost is low. Effect

Inactive Publication Date: 2021-10-12
郭涛
View PDF11 Cites 0 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

[0005] The present invention proposes an aluminum alloy for the production of ladder rungs for wind power towers, in order to solve the above-mentioned problem that the produced profiles cannot meet the requirements of use due to the unreasonable ratio of alloy elements

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Examples

Experimental program
Comparison scheme
Effect test

Embodiment 1

[0016] The present invention proposes an aluminum alloy for the production of wind power tower ladder rungs. The formula of its raw materials is as follows: Si: 0.37%, Fe: 0.14%, Cu: 0.08%, Mn: 0.08%, Mg: 0.5 %, Cr: 0.04%, Zn: 0.08%, Ti: 0.08%, and the rest are Al and unavoidable impurities.

[0017] The present invention also provides a preparation process for an aluminum alloy used to produce wind power tower ladder rungs, comprising the following steps:

[0018] (1) Melting and casting: aluminum, silicon, iron, copper, manganese, magnesium, chromium, zinc, titanium and other impurity components are added in proportion to melting and casting into aluminum rods and homogenized;

[0019] (2) Production of ladder rungs: heat the aluminum rods to 480°C and then extrude them at a speed of 7-10m / min;

[0020] (3) Quenching is carried out after discharging the material in (2), and after aging at 175° C. for 3 hours, the wind power tower climbing ladder rung profile is obtained.

Embodiment 2

[0022] The present invention proposes an aluminum alloy for the production of wind power tower ladder rungs. The formula of its raw materials is as follows: Si: 0.38%, Fe: 0.15%, Cu: 0.09%, Mn: 0.09%, Mg: 0.52 %, Cr: 0.05%, Zn: 0.09%, Ti: 0.09%, and the rest are Al and unavoidable impurities.

[0023] The present invention also provides a preparation process for an aluminum alloy used to produce wind power tower ladder rungs, comprising the following steps:

[0024] (1) Melting and casting: aluminum, silicon, iron, copper, manganese, magnesium, chromium, zinc, titanium and other impurity components are added in proportion to melting and casting into aluminum rods and homogenized;

[0025] (2) Production of ladder rungs: heat the aluminum rods to 485°C and extrude them at a speed of 7-10m / min;

[0026] (3) Quenching is carried out after discharging the material in (2), and after aging at 175° C. for 3 hours, the wind power tower climbing ladder rung profile is obtained.

Embodiment 3

[0028] The present invention proposes an aluminum alloy for the production of wind power tower ladder rungs. The formula of its raw materials is as follows: Si: 0.39%, Fe: 0.16%, Cu: 0.1%, Mn: 0.1%, Mg: 0.53 %, Cr: 0.06%, Zn: 0.1%, Ti: 0.1%, and the rest are Al and unavoidable impurities.

[0029] The present invention also provides a preparation process for an aluminum alloy used to produce wind power tower ladder rungs, comprising the following steps:

[0030] (1) Melting and casting: aluminum, silicon, iron, copper, manganese, magnesium, chromium, zinc, titanium and other impurity components are added in proportion to melting and casting into aluminum rods and homogenized;

[0031] (2) Production of ladder rungs: heat the aluminum rods to 490°C and then extrude them at a speed of 7-10m / min;

[0032] (3) Quenching is carried out after discharging the material in (2), and after aging at 175° C. for 3 hours, the wind power tower climbing ladder rung profile is obtained.

[0...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to view more

PUM

No PUM Login to view more

Abstract

The invention discloses an aluminum alloy for producing a ladder stand pedal stick of a wind power tower. The aluminum alloy is prepared from the following raw materials: 0.37 to 0.39 percent of Si, 0.14 to 0.16 percent of Fe, 0.08 to 0.10 percent of Cu, 0.08 to 0.10 percent of Mn, 0.5 to 0.53 percent of Mg, 0.04 to 0.06 percent of Cr, 0.08 to 0.10 percent of Zn, 0.08 to 0.10 percent of Ti and the balance of Al and inevitable impurities. The invention further provides a preparation process of the aluminum alloy for producing the ladder stand pedal stick of the wind power tower. According to the aluminum alloy for producing the ladder stand pedal stick of the wind power tower, on the premise that all the performance of original aluminum alloy can be met, the cost is low, proportioning is convenient, the mechanical property and the use performance of a produced ladder stand guide rail profile can reach the standard, and the existing production requirements are met.

Description

technical field [0001] The invention relates to the technical field of aluminum alloy preparation, in particular to an aluminum alloy used for producing wind power tower climbing ladder rungs. Background technique [0002] The inside of the wind power tower is connected with the vertical beam by ladder rungs, which are mainly used for maintenance personnel to climb and carry weight when climbing. The ladder rungs are generally produced by aluminum alloy ingots through extrusion, quenching, aging and other processes. Due to the special installation process of the rung profile, the rung profile is required to not allow cracking after swelling and riveting under the condition of meeting the mechanical properties, which puts higher requirements on the composition and production process of aluminum alloy. [0003] 6063 alloy belongs to Al-Mg-Si series medium strength and gold, because of its excellent extrudability and corrosion resistance, it is widely used in the production of...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to view more

Application Information

Patent Timeline
no application Login to view more
Patent Type & Authority Applications(China)
IPC IPC(8): C22C21/08C22C1/02C22F1/047
CPCC22C21/08C22C1/026C22F1/047C22F1/002
Inventor 王柳明张虎杨雯婕
Owner 郭涛
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Try Eureka
PatSnap group products