Polyurethane hard bubble sandwiched integral heat preservation light wall board and method for making same
A polyurethane rigid foam, lightweight wallboard technology, applied in thermal insulation, chemical instruments and methods, walls, etc., can solve the problems of wallboard strength, bending and compressive resistance, fireproof and waterproof performance are not stable enough, cannot be formed at one time, and high cost , to achieve outstanding thermal insulation and waterproof effect, not easy to crack and penetrate, and good environmental performance.
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Examples
Embodiment 1
[0027] First clean the concrete wallboard to ensure that the wallboard surface (referring to the pouring bonding interface) is smooth and smooth without obvious protruding blocks. After the wallboard is installed, ensure that the distance between the wallboards is 30mm, use foaming equipment to stir, and control the temperature at 20 °C, the mixed solution of polyether polyol and isocyanate mixed in a ratio of 1:0.9 was stirred at 3000 rpm for 10 seconds and then injected between the wallboards. After the foaming material is injected, the construction opening of the wallboard is closed. After 20 minutes of curing time, the finished product is obtained.
Embodiment 2
[0029] First clean the concrete wallboard to ensure that the surface of the wallboard (referring to the bonding interface) is smooth and smooth without obvious protruding blocks. After the wallboard is installed, ensure that the distance between the wallboards is 30mm, and control the temperature at 30°C with polyether polyol and Isocyanate, according to the ratio of 1:1.2 poured into a plastic container to mix, stirred by hand for 15 seconds and then injected between the wallboards. After the foaming material is injected, the construction opening of the wallboard is closed. After the curing time reaches 40 minutes, a thermal insulation wall with good thermal insulation and waterproof performance is formed.
Embodiment 3
[0031] First clean the concrete wallboard to ensure that the surface of the wallboard (referring to the bonding interface) is smooth and smooth without obvious protruding blocks. After the wallboard is installed, ensure that the distance between the wallboards is 30mm, and the temperature is controlled at 50°C. Isocyanate, according to the ratio of 1:1.0 poured into a plastic container to mix, stirred by hand for 15 seconds before injecting between the wallboards. After the foaming material is injected, the construction opening of the wallboard is closed. After the curing time reaches 35 minutes, a thermal insulation wall with good thermal insulation and waterproof performance is formed.
PUM
Property | Measurement | Unit |
---|---|---|
flexural strength | aaaaa | aaaaa |
thickness | aaaaa | aaaaa |
thickness | aaaaa | aaaaa |
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com