Pore sealing and plugging material suitable for laneways and application method thereof
A leak-stopping material and hole-sealing technology, applied in the field of leak-stopping materials, can solve problems such as poor sealing of seepage through fissures in surrounding rocks, affecting the stability of surrounding rocks, and leakage of surrounding rock walls, etc., achieving economical, safe, fast, Good plugging, fast plugging effect
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Examples
Embodiment 1
[0022] Embodiment 1: When the above-mentioned hole sealing and leakage plugging material is applied to the hole sealing of the grouting pipe in the shaft:
[0023] For material configuration, 425# ordinary Portland cement and 35Be water glass are used; 1 part of water, 2.1-2.3 parts of cement, and 0.022-0.03 parts of water glass.
[0024] The outer diameter of the grouting pipe is 36mm, the inner diameter is 32mm, the diameter of the grouting hole is 42mm, the length of the grouting pipe is 2.8 meters, and the depth of the grouting hole is 3 meters.
[0025] First mix water and water glass evenly, then put the water glass and water mixture into the cement, and stir quickly; within 1 to 2 minutes, put the prepared slurry evenly on the last 5cm of the grouting pipe to be sealed. For the left and right sections, the smear thickness is slightly smaller than the difference between the radius of the grouting hole and the outer radius of the grouting pipe. Then insert the grouting p...
Embodiment 2
[0026] Embodiment 2: When the above-mentioned hole sealing and plugging material is applied to the plugging of water seepage and gushing water in the surrounding rock in the tunnel leading to the water-containing fissure zone:
[0027] For material configuration, 425# ordinary Portland cement and 40Be water glass are used; 1 part of water, 2.3-2.5 parts of cement, and 0.01-0.018 parts of water glass.
[0028] In the roadway with shotcrete layer, water gushes from cracks in the surrounding rock within 2 meters axially and 1.6 to 2.3 meters away from the bottom plate. The cracks in the surrounding rock are cracked by 3 to 7 mm, and the water flow is not large.
[0029] First mix water and water glass evenly, then mix with cement, stir quickly and evenly, within 1 to 3 minutes, quickly and sequentially insert the prepared materials into the water gushing cracks and plug them tightly, which can realize convenient and fast plugging.
Embodiment 3
[0030] Example 3: When the above-mentioned hole-sealing and leak-stopping material is used to seal the grout leakage from the cracks on the surrounding rock wall of the shaft during the grouting process:
[0031] For material configuration, 425# ordinary Portland cement and 40Be water glass are used; 1 part of water, 2.8-3.0 parts of cement, and 0.0025-0.005 parts of water glass. Using method is identical with embodiment 2.
PUM
Property | Measurement | Unit |
---|---|---|
thickness | aaaaa | aaaaa |
length | aaaaa | aaaaa |
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com