Inter-well monitoring method for radioactive isotope
A technology for radioisotopes and monitoring wells, applied in construction and other directions, can solve the problems of unfavorable personnel, environmental safety, high labor and material costs, and difficult to implement, and achieve the effects of low cost, simple operation, and easy implementation.
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Examples
Embodiment
[0030] A radioactive isotope cross-well monitoring method, comprising the following steps:
[0031] (1) Take background samples: Take background samples from each monitoring well, the background samples are oil-water mixed samples, the background samples contain 300-700ml of water, and the background samples contain 500ml of water. optimal;
[0032] (2) Selection and dosage of radioisotope tracer: Tritium water is used as radioisotope tracer, and the injected amount of tritium water is calculated according to the following formula:
[0033] V=∏R2ФhS
[0034] A=μMDLV
[0035] Where, V-estimated maximum dilution volume, m 3 ;
[0036] R-average well spacing, m;
[0037] h - the average thickness of the oil layer, m;
[0038] S-average water saturation of oil layer, %;
[0039] Ф-average porosity of reservoir, %;
[0040] A-tracer injection volume;
[0041] MDL-minimum detection concentration;
[0042] μ-Guarantee factor;
[0043] (3) Inject radioactive isotope tracers...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com