Deep foundation pit supporting method and system characterized by steel reinforced cement-soil piles, bolts easy to detach and automatic monitoring and early warning
A technology for deep foundation pit support and cement-soil piles, which is applied in excavation, alarms, infrastructure engineering, etc., can solve the problems of lack of focus on dynamic adjustment of informatization, affecting the construction of underground engineering, and not adapting to groundwater, etc. Good economic and social benefits, simple structure, and the effect of reducing construction costs
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0046] The construction of this method is simple. After using rotary digging or reverse circulation drilling rig to construct borehole 03, backfill the soil excavated from the borehole and then use a cement-soil mixing pile machine to add cement to the hole to form cement-soil 11. Lift the shaped steel 10 on the top of the drilled hole and drive it into the drilled hole 03 through vibration, then use a drilling machine to form a hole to construct the glass fiber anchor rod 20, install the stress sensor 33, and then install the connecting beam 13 around the shaped steel cement soil pile 12 Between the anchor head 21, an inductive static level 32 is finally installed on the ground surface 00 around the foundation pit. During the excavation of the foundation pit, a modular inclination sensor 34 is installed layer by layer on the steel cement soil pile circumference 12, and all sensors It is connected with the automatic data acquisition instrument 31, and the data acquisition instr...
Embodiment 2
[0060] according to figure 1 , figure 2 It can be seen that a type of steel cement soil pile + easily broken anchor + automatic monitoring and early warning of deep foundation pit support system , it consists of steel cement soil piles including steel 10 and cement soil 11, glass fiber anchor 20 includes the first glass fiber anchor 20a, the second glass fiber anchor 20b, the third glass fiber anchor 20b, anchor head 21 includes the first One anchor head 21a, the second anchor head 21b, the third anchor head 21c, the connecting beam 13 includes the first connecting beam 13a, the second connecting beam 13b, the third connecting beam 13c, the inclination sensor 34 includes the first inclination sensor 34a, the Two inclination sensors 34b, the third inclination sensor 34c, the electrostatic level 32, and the stress sensor 33 comprise the first stress sensor 33a, the second stress sensor 33b, the third stress sensor 33c, and the automatic monitoring and early warning system 30....
PUM

Abstract
Description
Claims
Application Information

- R&D
- Intellectual Property
- Life Sciences
- Materials
- Tech Scout
- Unparalleled Data Quality
- Higher Quality Content
- 60% Fewer Hallucinations
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2025 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com