Concrete for high-ground stress and high-ground temperature tunnel excavation primary support
A technology of tunnel excavation and high ground stress, applied in the direction of sustainable waste treatment, solid waste management, climate sustainability, etc., can solve the problems that concrete is difficult to meet the construction requirements, and achieve good construction performance, reduce rockburst, and heat resistance good performance
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Examples
Embodiment 1
[0020] Concrete for the initial support of high ground stress and high ground temperature tunnel excavation, the thickness of the sprayed layer is 15cm, 1m 3 The quality of the contained raw materials are: cement 400kg, coarse aggregate 910kg, sand 480kg, water 200kg, grade II fly ash 50kg, basalt fiber 40kg, redispersible latex powder 10kg, imitation steel fiber 6kg, polycarboxylate high-performance reducing Water agent 3kg, aluminate accelerator 15kg.
[0021] Mix the raw materials of the concrete in a double-shaft horizontal forced mixer to prepare the required concrete. After testing, the results show that the concrete can withstand a high temperature of 80°C, and the strength of the concrete will not change or change under high temperature. Cracks appear; under the gravity impact of the hammer, although the concrete is deformed, no cracks appear, and the strength does not decrease much, and the surrounding rock can continue to be supported. Therefore, the concrete prepar...
Embodiment 2
[0023] Concrete for the initial support of high ground stress and high ground temperature tunnel excavation, the thickness of the sprayed layer is 10cm, 1m 3 The quality of raw materials contained are: cement 350kg, coarse aggregate 1000kg, sand 450kg, water 220kg, grade II fly ash 100kg, basalt fiber 30kg, redispersible latex powder 12kg, imitation steel fiber 7kg, polycarboxylate high-performance reducing Water agent 2kg, accelerator 10kg.
Embodiment 3
[0025] Concrete for the initial support of tunnel excavation with high ground stress and high ground temperature, the thickness of the spray layer is 15cm, 380kg of cement, 850kg of coarse aggregate, 550kg of sand, 210kg of water, 80kg of grade II fly ash, 20kg of basalt fiber, and 15kg of redispersible latex powder , Imitation steel fiber 8kg, polycarboxylate high-performance water reducer 2kg, accelerator 12kg.
PUM
Property | Measurement | Unit |
---|---|---|
particle diameter | aaaaa | aaaaa |
length | aaaaa | aaaaa |
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com