Reproducible asphalt mixture and preparation method thereof
A technology of recycled asphalt and mixture, which is applied in the direction of building insulation materials, building components, buildings, etc. It can solve the problems of aging of asphalt components, long construction period, recycled asphalt, etc., and achieve the improvement of high temperature stability and water stability of the road surface. Preparation The method is simple and the asphalt performance is good
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Examples
Embodiment 1
[0019] A renewable asphalt mixture, comprising the following components in parts by weight: 100 parts of waste No. 90 road petroleum asphalt, 15 parts of waste engine oil, 8 parts of fly ash, 1 part of cerium trichloride, and 0.8 part of zirconium dioxide , polyethylene glycol 9 parts, epoxy resin E-44 16 parts, urethane 8 parts, phthalate 15 parts.
[0020] The preparation method of described renewable asphalt mixture, comprises the following steps:
[0021] (1) take each component by weight, for subsequent use;
[0022] (2) Stir the waste No. 90 road petroleum asphalt, fly ash, waste engine oil, polyethylene glycol and epoxy resin at 40°C for 5 minutes;
[0023] (3) Then add cerium trichloride, zirconium dioxide, ethyl carbamate and phthalate, and stir for 5 minutes at room temperature to prepare a renewable asphalt mixture.
Embodiment 2
[0025] A renewable asphalt mixture, comprising the following components in parts by weight: 100 parts of waste No. 90 road petroleum asphalt, 5 parts of waste engine oil, 2 parts of fly ash, 0.2 part of cerium trichloride, and 0.4 part of zirconium dioxide , 3 parts of polyethylene glycol, 10 parts of epoxy resin E-44, 5 parts of urethane, 8 parts of phthalate.
[0026] The preparation method of described renewable asphalt mixture, comprises the following steps:
[0027] (1) take each component by weight, for subsequent use;
[0028] (2) Stir the waste No. 90 road petroleum asphalt, fly ash, waste engine oil, polyethylene glycol and epoxy resin at 60°C for 20 minutes;
[0029] (3) Then add cerium trichloride, zirconium dioxide, ethyl carbamate and phthalate, and stir for 15 minutes at room temperature to prepare a renewable asphalt mixture.
Embodiment 3
[0031] A renewable asphalt mixture, comprising the following components in parts by weight: 100 parts of waste No. 90 road petroleum asphalt, 12 parts of waste engine oil, 6 parts of fly ash, 0.3 part of cerium trichloride, and 0.6 part of zirconium dioxide , 8 parts of polyethylene glycol, 15 parts of epoxy resin E-44, 6 parts of urethane, 10 parts of phthalate.
[0032] The preparation method of described renewable asphalt mixture, comprises the following steps:
[0033] (1) take each component by weight, for subsequent use;
[0034] (2) Stir the waste No. 90 road petroleum asphalt, fly ash, waste engine oil, polyethylene glycol and epoxy resin at 45°C for 15 minutes;
[0035] (3) Then add cerium trichloride, zirconium dioxide, ethyl carbamate and phthalate, and stir at room temperature for 10 minutes to prepare a renewable asphalt mixture.
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com