A road construction method at the junction of sidewalks and non-motor vehicle lanes
A non-motor vehicle lane and road construction technology, applied in the construction field, can solve problems such as troublesome maintenance and cracking of the road surface, and achieve the effects of quality improvement, good waterproof performance, and improved durability
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0028] Please refer to the attached figure 1 , a road construction method, the road construction method here is applicable to the construction method of motor vehicle lanes and non-motor vehicle lanes.
[0029] Step a:
[0030] Clean up and level the road surface that needs to be paved, and fill it with pond slag to form a roadbed 1 .
[0031] Specifically, before filling the foundation of the road section, the existing soil, demolition and construction waste, and the existing cement pavement are all excavated and removed, and the underlying weeds and tree roots are eliminated. Weeds, tree roots, crop residues, and rotting All soil and garbage must be removed; on this basis, the entire road section should be cleared.
[0032] Step b:
[0033] The first pond slag treatment layer 2a and the second pond slag treatment layer 2b are successively laid on the top of the roadbed 1, and the thicknesses of the first pond slag treatment layer 2a and the second pond slag treatment laye...
Embodiment 2
[0050] Please refer to the attached figure 2 , a road construction method, the road construction method here is applicable to the road construction method at the intersection of sidewalks and non-motor vehicle lanes.
[0051] Step a:
[0052] Clean up and level the road surface that needs to be paved, and form the first subgrade 111 for pond slag filling on the road surface where the non-motor vehicle lane is located; pave the first pond slag treatment layer 2a and the second pond slag treatment layer at the non-motor vehicle lane 2b.
[0053] Specifically, before filling the foundation of the road section, the existing soil, demolition and construction waste, and the existing cement pavement are all excavated and removed, and the underlying weeds, tree roots, etc. All soil and garbage must be removed; on this basis, the entire road section should be cleared.
[0054] The thicknesses of the first pond residue treatment layer 2 a and the second pond residue treatment layer ...
PUM
Property | Measurement | Unit |
---|---|---|
thickness | aaaaa | aaaaa |
thickness | aaaaa | aaaaa |
thickness | aaaaa | aaaaa |
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com