[0024] At the same time, the present invention also provides a method for preparing the modified asphalt used for steel box girder bridge deck. The method includes the following steps:
[0025] A. Mix rock asphalt and petroleum asphalt at 150-180°C, stir and pre-mix for 0.5-1h to swell, and then initial shear, then stir for 1.5-2h;
[0026] B. After the mixing is completed, the three-stage high-speed shearing machine is used for fine shearing before storage, so that the rock powder is evenly blended into the petroleum asphalt;
[0027] C. Store while stirring at a temperature of 150-160°C;
[0028] D. Add rubber asphalt and modifier to the product obtained in step C, and react after mixing. The reaction temperature is 150-180°C, the reaction time is 3-4h, and the reaction process is stirred at a high speed, and the stirring speed is 2000-3000r / min. modified asphalt.
Embodiment 1
[0031] Example 1 Prepare modified asphalt 1 with the technical scheme of the present invention
[0032] The raw material composition of the modified asphalt 1 is as follows: in parts by weight, 10 parts of rock asphalt, 18 parts of rubber asphalt, 5 parts of modifier, and 85 parts of petroleum asphalt. The modifier is ferrous sulfate: ferrous chloride: coal tar = 1:1:3.
[0033] The preparation method is as follows, comprising the following steps:
[0034] A. Mix rock asphalt and petroleum asphalt at 150°C, stir the premixed swell for 0.5h, then initial shear, and then stir for 1.5h;
[0035] B. After the mixing is completed, the three-stage high-speed shearing machine is used for fine shearing before storage, so that the rock powder is evenly blended into the petroleum asphalt;
[0036] C. Store while stirring at a temperature of 150°C;
[0037] D. Add rubber asphalt and modifier to the product obtained in step C, and react after mixing. The reaction temperature is 150°C, ...
Embodiment 2
[0038] Example 2 Prepare modified asphalt 2 with the technical scheme of the present invention
[0039] The raw material composition of the modified asphalt 2 is: by weight, 15 parts of rock asphalt, 22 parts of rubber asphalt, 9 parts of modifier, and 90 parts of petroleum asphalt. The modifier is ferrous sulfate: ferrous chloride: coal tar = 2:2:5.
[0040] The preparation method is as follows, comprising the following steps:
[0041] A. Mix rock asphalt and petroleum asphalt at 180°C, stir for premixing and swelling for 1 hour, then initial shear, and then stir for 2 hours;
[0042] B. After the mixing is completed, the three-stage high-speed shearing machine is used for fine shearing before storage, so that the rock powder is evenly blended into the petroleum asphalt;
[0043] C. Store while stirring at a temperature of 160°C;
[0044] D. Add rubber asphalt and modifier to the product obtained in step C, and react after mixing. The reaction temperature is 180°C, the rea...
PUM
| Property | Measurement | Unit |
|---|---|---|
| particle size | aaaaa | aaaaa |