Looking for breakthrough ideas for innovation challenges? Try Patsnap Eureka!

A construction method for engineering geological drilling based on wireline core drilling tools

A coring drilling tool and engineering geology technology, which is applied in drilling equipment and methods, undisturbed core extraction devices, earthwork drilling, etc., can solve the problems of affecting the stability of the hole wall, easily hitting the hole wall, and large soil disturbance, etc. Achieve the effect of reducing uncertain factors, accurate test results, and small soil disturbance

Active Publication Date: 2018-08-17
ZHUHAI EAGLER SPECIALTY DRILLING EQUIP CO LTD
View PDF7 Cites 3 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

[0003] At present, the most widely used engineering geological drilling is to use a vertical shaft drilling rig (such as XY-1 or XY-2 type) and a single-tube drilling tool to drill with a cemented carbide drill bit mechanically, without sending water and dry drilling, and the footage is 0.5~ 2 meters, lift a big drill, take the core and carry out the standard penetration test, you need to lift the whole set of drill pipe and drilling tools out of the hole. The biggest advantage of this method is low cost and simple operation, but The limitations and shortcomings are also very obvious. Due to the single-pipe drilling, the disturbance to the soil layer is large, and it is difficult to extract undisturbed soil samples in complex strata, resulting in poor core quality; Or put down the entire drill pipe and drilling tools, it is easy to damage the hole wall, and often occurs such as block dropping and hole collapse, resulting in drill sticking accidents; in addition, during the standard penetration test, the drill pipe is elastically deformed by the hammer and easily hits the hole wall, which affects the stability of the hole wall, and the friction between the drill pipe and the hole wall affects the test accuracy

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • A construction method for engineering geological drilling based on wireline core drilling tools
  • A construction method for engineering geological drilling based on wireline core drilling tools

Examples

Experimental program
Comparison scheme
Effect test

Embodiment Construction

[0025] Such as figure 1 As shown, the drilling tool in the present invention is a single-action double-tube wireline core drilling tool, including an outer tube assembly 1 and an inner tube assembly 2 inserted in the outer tube assembly 1, the outer tube assembly 1 It includes a bullet stopper 11, a bullet chamber 12, a seat ring 13, an outer tube 14, a reamer 15, and a core bit 16 connected sequentially from top to bottom, and the minimum inner diameter of the outer tube assembly 1 is not less than 56mm, the core drill bit 16 is made of hard alloy, or a composite drill bit or a diamond-impregnated drill bit, with an outer diameter of 75.7mm and an inner diameter of 56mm. The drilling tool head assembly 21, the rock core pipe 22, the retaining spring seat 23 and the retaining spring 24, the seat ring 13 can limit the support of the drilling tool head assembly 21, and the drilling tool head assembly 21 is provided with a block that can be locked with the bullet. The head 11 co...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

PUM

No PUM Login to View More

Abstract

The invention discloses an engineering geological drilling construction method based on a rope core drilling tool. It adopts a single-action double-tube drilling tool to press-in drilling during rotation. The full-hole and tube drilling speed is very fast, the mud consumption is small, and the rock The core tube remains in a non-rotating state, causing little disturbance to the soil. When the drilling depth reaches the length of the core tube, the oil cylinder lifts the entire drilling tool a certain distance from the bottom of the hole to pull out the core. The core quality is high and can be Extract undisturbed soil samples; during coring and standard penetration tests, the drill pipe and outer pipe assembly always remain motionless in the borehole, protecting the hole wall and avoiding damage to the hole wall by repeatedly lifting the drill. At the same time, it also reduces the risk of the test rod and the The friction of the hole wall reduces uncertain factors and makes the test results more accurate.

Description

technical field [0001] The invention relates to the technical field of engineering geological drilling, in particular to an engineering geological drilling construction method based on a rope core drilling tool. Background technique [0002] Engineering geological drilling is to use drilling tools to drill into the formation according to certain purposes and requirements, and take out cores and soil samples to find out the geological conditions and foundation bearing capacity. This requires drilling into the topsoil layer and has special sampling requirements, and also requires It is one of the purposes of engineering drilling to carry out special testing work in boreholes and take undisturbed soil samples. This is to measure the physical and mechanical properties of the natural structure of the soil, such as capacity, density, temperature, shear strength, and compressibility coefficient. Describe the characteristics of rock and soil and determine the bearing capacity and st...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

Application Information

Patent Timeline
no application Login to View More
Patent Type & Authority Patents(China)
IPC IPC(8): E21B7/00E21B25/00E21B47/00
CPCE21B7/00E21B25/00
Inventor 王坚刘绪勇
Owner ZHUHAI EAGLER SPECIALTY DRILLING EQUIP CO LTD
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Patsnap Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Patsnap Eureka Blog
Learn More
PatSnap group products