A tail gas treatment and delayed coking technology, applied in chemical instruments and methods, separation methods, water/sludge/sewage treatment, etc., can solve the emulsification problem of sulfur-containing sewage, high oil content and coke powder content affect the operation of downstream devices, etc. problem, to achieve the effect of prolonging the operation cycle and optimizing the venting process
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Example Embodiment
[0035] Example 1
[0036] A delayed coking tail gas treatment method includes the following steps: the exhaust gas from the coke tower (a large amount of steam carries oil and gas) enters the lower part of the steam blowing and venting tower for cooling and oil-water separation, and five separation trays are arranged on the upper part of the steam blowing and venting tower, A 6-layer baffle tray is set in the lower part, the gasoline at the top of the tower is refluxed, the temperature at the top of the tower is 100℃, and the temperature at the bottom of the blowing and venting tower is 130℃. The heavy oil at the bottom of the tower is pumped out by the pump at the bottom of the blowing and venting tower and cooled to After 90℃, part of the heavy dirty oil at the bottom of the blowing steam venting tower will return to the bottom of the blowing venting tower, and the other part will enter the middle of the blowing venting tower. The light dirty oil and sewage at the top of the blo...
Example Embodiment
[0037] Example 2
[0038] A delayed coking tail gas treatment method, including the following steps: the exhaust gas from the coke tower (a large amount of steam carries oil and gas) enters the lower part of the steam blowing and venting tower for cooling and oil-water separation. The upper part of the blowing and venting tower is provided with three trays, and the lower part Set up 8 trays, reflux gasoline at the top of the tower, the temperature at the top of the tower is 100°C, and the temperature at the bottom of the steam blowing and venting tower is 130°C. The heavy oil at the bottom of the tower is pumped out by the pump at the bottom of the steam blowing and venting tower and cooled to 90°C by a cooler. Part of the heavy dirty oil at the bottom of the steam blowing and venting tower flows back to the bottom of the blowing and venting tower, and the other part enters the middle of the blowing and venting tower. The light sludge and sewage at the top of the blowing and venti...
Example Embodiment
[0039] Example 3
[0040] A delayed coking tail gas treatment method includes the following steps: the exhaust gas from the coking tower (a large amount of steam carries oil and gas) enters the lower part of the steam blowing and venting tower for cooling and oil-water separation. The upper part of the blowing and venting tower is provided with 7 trays, and the lower part Set up 5 layers of trays, the top of the tower is refluxed with gasoline, the top temperature is 100°C, and the bottom temperature of the blowing and venting tower is 130°C. The heavy oil at the bottom of the tower is pumped out by the pump at the bottom of the blowing and venting tower and cooled to 90°C by a cooler. Part of the heavy dirty oil at the bottom of the steam blowing and venting tower flows back to the bottom of the blowing and venting tower, and the other part enters the middle of the blowing and venting tower. The light sludge and sewage at the top of the blowing and venting tower are first cooled ...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap