Embodiment 1
[0028] 1. Prepare the air-proof coating high alumina bauxite on the outside of the nozzle body, the corrosion-resistant coating high-purity capacitor spinel, and the refractory aluminum carbon required for the upper nozzle and the connection;
[0029] 2. Firstly, the high-alumina bauxite, high-purity capacitor spinel, and aluminum carbon are each processed by a corundum ball mill. After the ball milling process, a coating with uniform particles is obtained, and then a thermosetting fat-dissolving additive is added, and the mixture is further mixed evenly through the milling machine;
[0030] 3. Dry the uniformly mixed coating obtained in step (2) naturally in the air for 5 hours, then transfer it to an oven and dry it at 80°C for 10 hours, and then store it in a material warehouse with constant temperature and humidity;
[0031] 4. Put the dried raw materials in step (3) into rubber sleeves that meet the technical requirements of the design, and form them with an isostatic pres...
Embodiment 2
[0037] 1. Prepare the gas-proof coating graphite, corrosion-resistant coating magnesium oxide-graphite on the outside of the nozzle body, and the refractory corundum required for the upper nozzle and the connection;
[0038] 2. Firstly, graphite, magnesia-graphite, and corundum are each processed by a corundum ball mill. After ball milling, a coating with uniform particles is obtained, and then metal-based Mg additives are added, and the mixture is further mixed uniformly through a mixer;
[0039] 3. The uniformly mixed paint obtained in step (2) is first dried naturally in the air for 8 hours, then transferred to an oven and dried at 90°C for 10 hours, and then stored in a material warehouse with constant temperature and humidity;
[0040] 4. Put the dried raw materials in step (3) into rubber sleeves that meet the technical requirements of the design, and form them with an isostatic press under a pressure of 200Mpa;
[0041] 5. drying the semi-finished product obtained after...
Embodiment 3
[0046] 1. Prepare the anti-breathable coating silicon carbide powder on the outside of the nozzle body, the corrosion-resistant coating zircon, and the refractory material zirconia required for the upper nozzle and the connection;
[0047] 2. First, silicon carbide powder, zircon, and zirconia are treated with a corundum ball mill, and after ball milling, a coating with uniform particles is obtained, and then the additive of diyttrium trioxide is added, and the mixture is further mixed evenly through the milling machine;
[0048] 3. The uniformly mixed coating obtained in step (2) is first dried naturally in the air for 8 hours, then transferred to an oven and dried at 80°C for 10 hours, and then stored in a material warehouse with constant temperature and humidity;
[0049] 4. Put the dried raw materials in step (3) into rubber sleeves that meet the technical requirements of the design, and form them with an isostatic press under a pressure of 200Mpa;
[0050] 5. drying the s...
PUM
Login to View More Abstract
Description
Claims
Application Information
Login to View More 