Recycled pavement brick and preparation method thereof

A technology of recycled pavement and recycled aggregate, applied in the field of building materials, can solve the problems of environmental pollution and waste of resources, and achieve the effect of simple preparation method, low cost and broad market prospect

Inactive Publication Date: 2018-02-09
GUILIN CHUNXIAO ENVIRONMENTAL PROTECTION TECH CO LTD
View PDF3 Cites 0 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

If construction waste cannot be recycled in time, it will not only pollute the environment, but also cause a waste of resources

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • Recycled pavement brick and preparation method thereof

Examples

Experimental program
Comparison scheme
Effect test

Embodiment 1

[0023] The regenerated pavement brick of this embodiment is made of the following raw materials: 10kg of recycled construction waste aggregate, 20kg of gravel, 5kg of gelling agent, 20kg of water reducing agent, 5kg of coal gangue particles, 15kg of steel fiber, and 5kg of polypropylene fiber , 15kg of quicklime, 20kg of cement, 120kg of water and 10kg of polyamide, wherein, the regenerated aggregate of construction waste refers to the construction waste with a particle size of 2-10mm obtained after crushing, sieving, and removal of foreign matter, and the glue The coagulant is a mixture of light magnesium oxide, magnesium chloride and magnesium sulfate in a mass ratio of 50:20:30.

[0024] The preparation method of above-mentioned regenerated pavement brick, comprises the steps:

[0025] (1) Take raw materials with the following weight: 10kg of recycled construction waste aggregate, 20kg of gravel, 5kg of gelling agent, 20kg of water reducing agent, 5kg of coal gangue particl...

Embodiment 2

[0030] The regenerated pavement brick of this embodiment is made of the following raw materials: 25kg of recycled construction waste aggregate, 15kg of gravel, 10kg of gelling agent, 15kg of water reducing agent, 10kg of coal gangue particles, 10kg of steel fiber, and 10kg of polypropylene fiber , 10kg of quicklime, 50kg of cement, 90kg of water and 15kg of polyamide, wherein, the regenerated aggregate of construction waste refers to the construction waste with a particle size of 2-10mm obtained after crushing, sieving and removing foreign matter, and the construction waste The coagulant is a mixture of light magnesium oxide, magnesium chloride and magnesium sulfate in a mass ratio of 50:20:30.

[0031] The preparation method of above-mentioned regenerated pavement brick, comprises the steps:

[0032] (1) Take raw materials with the following weights: 25kg recycled aggregate from construction waste, 15kg gravel, 10kg gelling agent, 15kg water reducing agent, 10kg coal gangue p...

Embodiment 3

[0037] The regenerated pavement brick of this embodiment is made of the following raw materials: 40kg of recycled construction waste aggregate, 10kg of crushed stone, 15kg of gelling agent, 10kg of water reducing agent, 15kg of coal gangue particles, 5kg of steel fiber, and 15kg of polypropylene fiber , 5kg of quicklime, 80kg of cement, 60kg of water and 20kg of polyamide, wherein, the regenerated aggregate of construction waste refers to the construction waste with a particle size of 2-10mm obtained after crushing, sieving and removing foreign matter, and the construction waste The coagulant is a mixture of light magnesium oxide, magnesium chloride and magnesium sulfate in a mass ratio of 50:20:30.

[0038] The preparation method of above-mentioned regenerated pavement brick, comprises the steps:

[0039] (1) Take the following raw materials: 40kg of recycled construction waste aggregate, 10kg of gravel, 15kg of gelling agent, 10kg of water reducing agent, 15kg of coal gangue...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to view more

PUM

PropertyMeasurementUnit
particle diameteraaaaaaaaaa
Login to view more

Abstract

The invention discloses a recycled pavement brick and a preparation method thereof, and belongs to the technical field of building materials. The recycled pavement brick is prepared from the followingraw materials in parts by weight: 10-40 parts of recycled aggregate of construction wastes, 10-20 parts of gravel, 5-15 parts of a gelling agent, 10-20 parts of a water reducer, 5-15 parts of coal gangue particles, 5-15 parts of steel fiber, 5-15 parts of polypropylene fiber, 5-15 parts of quick lime, 20-80 parts of cement, 60-120 parts of water and 10-20 parts of polyamide. The recycled pavementbrick provided by the invention has the advantages of being high in strength, good in abrasion resistance, stable in quality, long in service life, low in cost, and capable of turning waste into treasure, protecting the environment and saving energy, thereby having good economic benefits and extensive social benefits.

Description

technical field [0001] The invention relates to a recycled pavement brick and a preparation method thereof, belonging to the technical field of building materials. Background technique [0002] Construction waste is the main component of urban waste. At present, the traditional open-air stacking and deep excavation are the main methods of dealing with construction waste. Although this method has a large processing volume, is convenient and simple, and has low processing costs, it actually occupies land resources. If construction waste cannot be recycled in time, it will not only pollute the environment, but also cause a waste of resources. Contents of the invention [0003] One of the objectives of the present invention is to provide a recycled pavement brick. The regenerated pavement brick of the invention has high strength, good wear resistance, stable quality, long service life, low cost, can turn waste into wealth, is environmentally friendly and energy-saving, and h...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to view more

Application Information

Patent Timeline
no application Login to view more
Patent Type & Authority Applications(China)
IPC IPC(8): C04B28/06C04B28/04
CPCC04B28/06C04B28/04C04B2111/0075C04B2201/50C04B18/167C04B14/02C04B22/066C04B22/12C04B22/142C04B18/12C04B16/0633C04B14/48C04B22/064C04B24/287C04B2103/302
Inventor 黄云鸿李力
Owner GUILIN CHUNXIAO ENVIRONMENTAL PROTECTION TECH CO LTD
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Try Eureka
PatSnap group products