Construction method of bored and bottom-compact cement grouting pile
A construction method and technology in drilling, which is applied in sheet pile walls, foundation structure engineering, construction, etc., can solve the problems that the bearing capacity of cast-in-place piles cannot meet the construction standards, etc., so as to improve the bearing capacity of piles and the resistance of pile ends , to ensure the overall effect
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Examples
specific Embodiment approach 1
[0025] Specific implementation mode one: the construction method of the bored rammed bottom grouting pile described in this implementation mode is realized according to the following steps:
[0026] Step 1. Drilling: Use a long auger to drill the hole;
[0027] Step 2. One-time grouting: inject cement slurry into the retaining wall from the bottom of the auger drill to form holes, control the grouting pressure of the cement slurry to 1-5mpa, control the water-cement ratio of the cement slurry to 0.6-0.8, and the aperture range to 300-1000mm;
[0028] Step 3. Drill bit lifting: ensure that the lifting speed of the drill bit of the auger drill is lower than the grouting speed, until the drill bit of the auger drill is completely lifted out of the borehole to complete a grouting;
[0029] Step 4. Bottom tamping: insert prefabricated high-strength concrete components into the borehole, and use prefabricated high-strength concrete components to perform high-frequency vibratory comp...
specific Embodiment approach 2
[0031] Specific implementation mode 2: In step 2 of this implementation mode, the grouting pressure of the cement slurry is controlled to be 2-4 mpa during the primary grouting.
[0032] In this way, the cement slurry has a cementation effect, and the pressure injection of the cement slurry can increase the resistance of the side of the pile and the resistance of the pile end. Other components and connections are the same as those in the first embodiment.
specific Embodiment approach 3
[0033] Specific implementation mode three: control the grouting pressure of the cement slurry to 3mpa during the first grouting in the second step of this embodiment.
[0034] In this way, the cement slurry has a cementation effect, and the pressure injection of the cement slurry can increase the resistance of the side of the pile and the resistance of the pile end. Other components and connections are the same as those in the second embodiment.