A single-pass furnace tube cracking furnace system and cracking method
A technology of cracking furnace and cracking furnace tube, which is applied in the direction of cracking, hydrocarbon cracking to hydrocarbon, non-catalytic thermal cracking, etc., and can solve the problem that the operation period of cracking furnace is not long enough
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0040] exist figure 1 Cracking reaction is carried out in the single-pass furnace tube pyrolysis furnace system shown, wherein the tube external diameter of one end of the furnace tube of the single-pass cracking furnace tube 4 used is 54mm, the tube wall thickness is 5mm, the tube external diameter of the other end of the furnace tube is 61mm, and the tube wall The thickness is 6mm, and the total length of the furnace tube is 11800mm. According to the description of the single-pass cracking furnace, the theoretical operation period of the single-pass cracking furnace without switching is 38 days, and the temperature resistance limit of the material of the single-pass cracking furnace is 1115°C.
[0041] The cracking reaction was carried out according to the following conditions: the feed rate was 16 tons / hour, the water-oil ratio was 0.5, the crossover temperature (XOT) was 630° C., and the cracking furnace outlet temperature (COT) was 865° C. The ethylene yield was 30.51 wt...
Embodiment 2
[0044] Carry out according to the method for embodiment 1, and difference is to use different single-pass cracking furnace tubes, and the outer tube diameter of one end of the furnace tube of this single-pass cracking furnace tube 4 is 48mm, and the tube wall thickness is 5mm, and the tube outer diameter of the other end of the furnace tube is The diameter is 52mm, the thickness of the tube wall is 6mm, and the total length of the furnace tube is 11800mm. According to the description of the single-pass cracking furnace, the theoretical operation period of the single-pass cracking furnace without switching is 26 days, and the temperature resistance limit of the material of the single-pass cracking furnace is 1115°C.
[0045] Also switch over at 84% of the theoretical operating cycle (day 21). The final cracking furnace runs for a total of 38 days, which is 146% of the theoretical operation period.
Embodiment 3
[0047] Carry out according to the method for embodiment 1, and difference is to have used different single-pass cracking furnace tubes, and the outer tube diameter of one end of the furnace tube of this single-pass cracking furnace tube 4 is 50mm, and the tube wall thickness 5mm, and the tube outer diameter of the other end of the furnace tube The diameter is 55mm, the thickness of the tube wall is 6mm, and the total length of the furnace tube is 11800mm. According to the record of the instruction manual of the single-pass cracking furnace tube, the theoretical operation period of the single-pass cracking furnace tube is 30 days without switching, and the temperature resistance limit of the material of the single-pass cracking furnace tube is 1115°C.
[0048] Also switch over at 84% of the theoretical operating cycle (day 25). The final cracking furnace runs for a total of 48 days, which is 160% of the theoretical operation period.
PUM
| Property | Measurement | Unit |
|---|---|---|
| length | aaaaa | aaaaa |
Abstract