Additive for asphalt mixture, asphalt mixture and preparation method thereof
A technology for asphalt mixtures and additives, applied in the field of additives for asphalt mixtures, asphalt mixtures and their preparation, can solve the problems of unsatisfactory distribution of nano-oxides, etc., and achieve enhanced road performance, easy agglomeration, and reduced damage Effect
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Examples
Embodiment 1
[0033] Configure the following raw materials: 4.6wt% of SBS modified asphalt, 86.9wt% of aggregate, 4.3wt% of mineral powder, and 4.2wt% of additives (composed of nano-zinc oxide and lake asphalt, the mass ratio is 2:25). The specific preparation steps of the asphalt mixture are: 1), add asphalt and additives and heat up to 160-180°C, and stir for 10 minutes; 2), control the temperature at 160-180°C, add aggregates to the asphalt mixture in step 1), Mix for 5 minutes; then add mineral powder and mix for 90 seconds to obtain a high-performance asphalt mixture.
[0034] Wherein, the preparation method of the additive comprises the following steps: adding nano-zinc oxide into a surfactant (sodium fatty alcohol ether sulfate), stirring for 10 minutes, washing, and drying to obtain surface-modified nano-oxides. The nano-oxide is placed in the lake pitch in the molten state, sheared at a high speed for 30 minutes, and the rotation speed is 4000r / min, and finally the additive is obta...
Embodiment 2
[0036] Configure the following raw materials: SBS modified asphalt 5.1wt%, aggregate 87.7wt%, mineral powder 4.3wt%, additive (composition of nano-titanium oxide and lake asphalt, mass ratio is 2:25) 2.9wt%. The specific preparation steps of the asphalt mixture are: 1), add asphalt and additives and heat up to 160-180°C, and stir for about 10 minutes; 2), control the temperature at 160-180°C, and add aggregates to the asphalt mixture in step 1) , and mix for about 5 minutes; then add mineral powder and mix for 90 seconds to obtain a high-performance asphalt mixture.
[0037] Wherein, the preparation method of the additive comprises the following steps: adding nano-titanium oxide into a surfactant (sodium fatty alcohol ether sulfate), stirring for 10 minutes, washing, and drying to obtain a surface-modified nano-oxide, the The nano-oxide is placed in the lake pitch in the molten state, sheared at a high speed for 30 minutes, and the rotation speed is 4000r / min, and finally the ...
Embodiment 3
[0039] The raw materials of the following composition are configured: 4.0wt% of SBS modified asphalt, 87.3wt% of aggregate, 4.5wt% of mineral powder, and 3.5wt% of additive (composition of nano-cerium oxide and lake asphalt). The specific preparation steps of the asphalt mixture are: 1), add asphalt and additives and heat up to 160-180°C, and stir for about 10 minutes; 2), control the temperature at 160-180°C, and add aggregates to the asphalt mixture in step 1) , and mix for about 5 minutes; then add mineral powder and mix for 90 seconds to obtain a high-performance asphalt mixture.
[0040] Wherein, the preparation method of the additive comprises the following steps: adding nano-cerium oxide into a surfactant (sodium fatty alcohol ether sulfate), stirring for 10 minutes, washing, and drying to obtain surface-modified nano-oxides. The nano-oxide is placed in the lake pitch in the molten state, sheared at a high speed for 30 minutes, and the rotation speed is 4000r / min, and f...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com