Embodiment 1
[0062] This embodiment provides an on-line control method for reducing S content in blast furnace gas, the flow chart is as follows figure 1 As shown, the steps are as follows:
[0063] Detection of SO in the flue gas generated by the combustion of the gas produced by the 7# blast furnace of Wuhan Iron and Steel Co., Ltd. 2 The content is 97.4~118.6mg / m 3 , at this time, the loading capacity of each batch of ore in the blast furnace is 90.6 tons, and the loading capacity of each batch of coke is 16.5 tons. In order to reduce the S content in the blast furnace gas, the following steps are carried out:
[0064] 1) Keep the loading capacity of each batch of ore in the blast furnace at 90.6 tons, and the charging capacity of coke at 16.5 tons.
[0065] 2) By setting the opening of the discharge gate and the number of turns of the distributor on each circle position, the ore / coke ratio of the 1st to 3rd distribution circles in the center remains unchanged, and the ore / coke ratio ...
Embodiment 2
[0073] The present embodiment provides an on-line control method for reducing S content in blast furnace gas, specifically as follows:
[0074] Detection of SO in the flue gas generated by the combustion of the gas produced by the 7# blast furnace of Wuhan Iron and Steel Co., Ltd. 2 The content is 123.0~137.9mg / m 3 , at this time, the loading capacity of each batch of ore in the blast furnace is 94.1 tons, and the loading capacity of each batch of coke is 17.3 tons. In order to reduce the S content in the blast furnace gas, the following steps are carried out:
[0075] 1) Keep the amount of ore loaded in each batch of blast furnace at 94.1 tons, and the amount of coke loaded at 17.3 tons.
[0076] 2) By setting the opening of the discharge gate and the number of turns of the distributor in each circle position, the ore / coke ratio of the 1st to 3rd circles in the center remains unchanged, and the ore / coke ratio of the 4th to 6th circles decreases 3.5%, the ratio of ore / coke i...
Embodiment 3
[0087] The present embodiment provides an on-line control method for reducing S content in blast furnace gas, specifically as follows:
[0088] Detection of SO in the flue gas generated by the combustion of the gas produced by the 7# blast furnace of Wuhan Iron and Steel Co., Ltd. 2 The content is 84.1~92.8mg / m 3 , At this time, the loading capacity of each batch of ore in the blast furnace was 93.4 tons, and the loading capacity of each batch of coke was 17.0 tons. In order to reduce the S content in the blast furnace gas, the following steps were carried out:
[0089] 1) Keep the loading capacity of each batch of ore in the blast furnace at 93.4 tons, and the charging capacity of coke at 17.0 tons,
[0090] 2) By setting the opening of the discharge gate and the number of turns of the distributor in each circle, the ore / coke ratio of the 1st to 3rd circles in the center remains unchanged, and the ore / coke ratio of the 4th to 6th circles decreases by 2 %, the ratio of ore / c...