A method for cleaning the coke in the modified asphalt production system by using washing oil
A technology of modified asphalt and production system, which is applied in the field of coke, which can solve the problems of poor cohesion and coking of medium-temperature asphalt, failure of full-load operation of the device, low mechanical strength, etc., and achieve the effect of improving cleaning efficiency and good cleaning effect
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0036] The difference between the temperature of the reactor heater (detected by thermocouple) and the temperature measuring point inside the reactor reached 13°C. It was judged that the modified asphalt production system was coked and cleaning was started.
[0037] (1) Cool down the system to 130°C, inject 80 tons of washing oil, and start the cycle cleaning process. The sampling results are shown in Table 1:
[0038] Table 1 Density of washing oil, quinoline content detection index
[0039] Sampling time (h) Density (g / cm 3 )
[0040] After 20 hours, the changes of density and quinoline insoluble matter content are both less than 3%, and it is considered that the cleaning is over. After cleaning, the modified asphalt system will be overhauled once this year and run for 10 months throughout the year.
Embodiment 2
[0042] When the temperature difference between the inlet and outlet of the tube furnace reached 27°C, it was determined that the modified asphalt production system was coked and cleaning was started.
[0043] (1) Cool down the system to 120°C, inject 60 tons of washing oil, and start the cycle cleaning process. The sampling results are shown in Table 2:
[0044] Density of table 2 washing oil, quinoline content detection index
[0045] Sampling time (h) Density (g / cm 3 )
[0046] After 48 hours, the changes in density and quinoline-insoluble content are still higher than 3%, and the wash oil is saturated, and the wash oil containing coke is discharged into the raw material tank. Continue to use the continuous feeding method to enter 60 tons of washing oil, use nitrogen to purge for 10 hours, and discharge all washing oil into the raw material tank. After the cleaning, the modified asphalt system has been overhauled twice this year, and it has been in operation ...
Embodiment 3
[0048] When the valve opening remains unchanged, the asphalt flow rate decreases by 11%. It is judged that the modified asphalt production system is coked and cleaning is started.
[0049] (1) Cool down the system to 150°C, inject 70 tons of washing oil, and start the cycle cleaning process. The sampling results are shown in Table 3:
[0050] Density of table 3 wash oil, quinoline content detection index
[0051] Sampling time (h) Density (g / cm 3 )
[0052] After 24 hours, if the change of the density and quinoline insoluble content is less than 3%, it is considered that the cleaning is completed. After the cleaning, the modified asphalt system will be overhauled once this year, and it will run for 10 months throughout the year.