A construction technology and mechanical technology, applied in artificial islands, sheet pile walls, water conservancy projects, etc., can solve the problems of low construction efficiency and instability of mechanical piles, and achieve the effect of improving construction efficiency, facilitating transportation and installation, and facilitating irrigation.
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Examples
Embodiment 1
[0026] A construction technique of mechanical piles in a tunnel for subway construction, comprising the following steps:
[0027] 1. Mud mixing
[0028] The mud used for opening the hole is made of high-quality bentonite. When drilling into the clay layer, the original soil can be used to make slurry. During the construction, the specific gravity, viscosity, sand content and colloidal rate of the mud are often measured, and the top surface of the mud inside the casing is always higher than the water level outside the casing. Technical requirements for mud preparation and testing:
[0029] (1) Collect mud samples in time, measure performance indicators, conduct the first test on the newly prepared mud, and conduct another test before use, and often test during the drilling process to ensure the quality of the mud;
[0030] (2) The stored mud is stirred every 8 hours, and each time the mud is stirred or the test result is used as the original record;
[0031] (3) After the fre...
Embodiment 2
[0052] A construction technique of mechanical piles in a tunnel for subway construction, comprising the following steps:
[0053] 1. Mud mixing
[0054] The mud used for opening the hole is made of high-quality bentonite. When drilling into the clay layer, the original soil can be used to make slurry. During the construction, the specific gravity, viscosity, sand content and colloidal rate of the mud are often measured, and the top surface of the mud in the casing is always higher than the water level outside the casing.
[0055] Technical requirements for mud preparation and testing:
[0056](1) Collect mud samples in time, measure performance indicators, conduct the first test on the newly prepared mud, and conduct another test before use, and often test during the drilling process to ensure the quality of the mud;
[0057] (2) The stored mud is stirred every 8 hours, and each time the mud is stirred or the test result is used as the original record;
[0058] (3) After th...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com