Embodiment 1
[0057] The temporary plugging construction process of solidified brine in well A in the fractured formation in eastern Sichuan is as follows:
[0058] Step 1. Dissolve 68 tons of sodium chloride in fresh water to prepare a density of 1.17g / cm 3 200 square meters of salt water, and then add curing agent, colloid protective agent, and initiator to prepare solidified salt water;
[0059] Prepare 40 cubic meters of temporary plugging type well killing fluid, the temporary plugging type well killing fluid is formed by adding the temporary plugging polymer particles into the solidified brine and dispersing;
[0060] Step 3: kill the well, first use a density of 1.15g / cm 3 The SW-1 type solid-free completion hydraulic well, the measured leakage is 3.8m 3 / h;
[0061] Step 3. Inject the temporary plugging type well killing fluid, and reverse 10m 3 The killing fluid was followed up to detect the leakage of solidified brine, and it was found that the leakage increased by 3.8m 3 / h ...
Embodiment 2
[0065] Construction conditions of well B in fractured formations in eastern Sichuan:
[0066] The pressure difference between the Changxing formation and the Carboniferous system in this well is about 13MPa, the pressure difference between the killing fluid and the formation is about 18Mpa, and the well temperature is 107°C.
[0067] The construction process as in Example 1 was used for temporary plugging, and the solidified brine worked for nearly two months, and the construction was safe. The well is a typical carbonate fracture formation. In order to ensure the reliability of temporary plugging, the temporary plugging polymer particles are added to the solidified brine as bridging particles. Finally, the acidification capacity returned to normal.
[0068] Beneficial effect: the beneficial effect of the present invention is that the temporary plugging polymer particles made of highly water-absorbing degradable polyester compound are used together with appropriate curing age...