Shallow buried rock stratum section underground continuous wall grooving construction method
A technology for groove-forming construction and ground-connecting walls, which is applied to sheet pile walls, foundation structure engineering, earth movers/shovels, etc., and can solve the problems of difficulty in ensuring the speed and quality of groove formation, cumbersome construction steps, and low construction efficiency, etc. problems, to achieve the effect of reducing mud transportation and excretion, shortening the construction period and improving construction efficiency
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment Construction
[0036] refer to figure 1 , figure 1 It is a schematic flow chart of the construction method for trenching the wall of the shallow buried rock section of the present invention.
[0037]The trenching construction method of the ground connection wall in the shallow buried rock layer section of the present invention includes the following construction steps: construction preparation, measurement and lofting, guide wall construction, trenching construction, trenching quality inspection, joint cleaning, sediment cleaning and pulp replacement, joint construction, hoisting Reinforcement cages, setting concrete conduits, pouring wall concrete and pulling out joint boxes. The construction method of the present invention not only simplifies the construction process, but also further introduces a full-hydraulic percussion reverse circulation drilling rig, which significantly improves the construction efficiency compared with the traditional percussion drilling and flushing rocks, reduces...