Maintenance method of blast furnace main channel
A main trench, blast furnace technology, applied in blast furnace, blast furnace details, blast furnace parts and other directions, can solve problems such as memory loss and structural damage, major production accidents, main trench damage, etc., to reduce consumption, prolong service life, and labor efficiency. boosted effect
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0060] On a certain day in a certain month, the No. 1 taphole of a blast furnace is tapping, and the thermocouple data corresponding to the main ditch is around 600°C, so it can be considered that the main ditch is in normal working condition.
Embodiment 2
[0062] On a certain day in a certain month, the No. 1 taphole of a blast furnace is tapping. Most of the thermocouple data corresponding to the main ditch are around 600°C, and some data exceed 700°C. It can be considered that the working status of the main ditch is basically normal, and some parts are working. layer is damaged. After the iron hole is switched (turned to the No. 3 iron hole for tapping, and the No. 1 iron hole is vacant), the working layer in the corresponding area of the high temperature couple is partially repaired within about 120 minutes.
Embodiment 3
[0064] On a certain day in a certain month, the No. 1 tap hole of a blast furnace is tapping. During the tapping process, the thermocouple data corresponding to the main ditch basically showed an upward trend, and gradually exceeded 700°C. It can be considered that the working layer of the main ditch was damaged in a large area And there is a tendency to erode to prefabricated parts and permanent layers. It is necessary to immediately request to turn over the site (from the No. 1 and No. 3 iron gates to the No. 2 and No. 4 iron gates), and within dozens of days when the main trenches 1 and 3 are vacant, the working layers of the main trenches 1 and 3 Clean up, check whether the prefabricated parts are intact, and re-cast the working layer while ensuring that the prefabricated parts are complete and leak-free.
PUM
Property | Measurement | Unit |
---|---|---|
thickness | aaaaa | aaaaa |
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com