An ecological purification and river channel technology, applied in chemical instruments and methods, biological water/sewage treatment, polluted waterway/lake/pond/river treatment, etc., can solve the problem of large area, large number of river channels, and unstable water flow direction, etc. question
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0038] The average width of the river 7 in a certain village is 11m. Due to the imperfect domestic sewage infrastructure in the village, the river 7 receives some domestic sewage. Since the main pollution source of the water quality of the river 7 is domestic sewage, and the infrastructure is not perfect, there are many abandoned pits and ponds on both sides of the river section of the river 7 flowing out of the village. Purify. The diversion channel 1 is 8m wide, 1m deep, and the water level is about 0.8m; the ecological permeable dam 4 in the diversion channel 1 is 8m wide, and the dam height is 1.3m; the ecological purification pond 2 is about 25m wide, 2m deep, the maximum width is 50m, and the water level is 1.5m m; The adsorption filler filter area 20 is set within 2m of the front end of the ecological purification pond 2, and 25 A and B gabion units 22 are alternately set in the vertical direction of the water flow, 4 rows of gabion units are set in the water flow direc...
Embodiment 2
[0040] The lower reaches of a tributary river flow into the main river channel 7 of the basin. At the same time, the water quality of the tributary river is poor, with COD > 100, BOD > 60, and water quality transparency is high. There are some aquatic plants in the original tributary channel 7. The side ecological purification system 100 is installed before the tributaries merge into the main stream to reduce the pollution of the tributaries to the main stream. The diversion channel 1 is 6m wide, 0.8m deep, and the diversion water level is about 0.5m; the ecological purification pond 2 is about 20m wide, 1.5m deep, the maximum width is 40m, and the water level is 1.0m; the ecological purification pond 2 is set within 4m of the front end. In zone 20, 20 A and B gabion units 22 are arranged alternately in the vertical direction of the water flow, 8 rows of gabion units are arranged in the direction of the water flow, and 2 layers of gabion units are arranged in the vertical direc...