Underground comprehensive pipe gallery construction equipment and method

A technology for construction equipment and comprehensive pipe gallery, applied in artificial islands, water conservancy projects, underwater structures, etc., can solve the problems of poor bearing capacity, large cement consumption, large construction space, etc., to increase the bending stiffness of the section, Easy to disassemble and install, increase the load-bearing effect

Active Publication Date: 2021-04-09
WUHAN SURVEYING GEOTECHN RES INST OF MCC
View PDF7 Cites 4 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

Since cast-in-place construction requires a large construction space, and the amount of earth excavation is also large, the concrete can only be removed when it reaches the design strength. The construction period is long, the cost is high, the construction procedures are complicated, and the site maintenance conditions are poor, so the project quality cannot be guaranteed. A large amount of concrete is required during the construction process, which is less environmentally friendly. The construction of prefabricated pipe galleries is more environmentally friendly. However, due to the huge tonnage of prefabricated pipe galleries, the requirements for hoisting and transportation equipment are high, and the existing construction equipment for pipe galleries cannot meet the construction conditions of prefabricated pipe galleries. , leading to great difficulties in the construction of prefabricated pipe gallery
[0004] At present, the protection piles for the foundation pit of the pipe gallery mainly include SMW piles, U-shaped steel sheet piles, etc. Among them, the SMW piles play the role of water stop through the cement soil after mixing, but the construction process needs to consume a lot of cement, and the cement is in the process of transportation and mixing. A large amount of dust, waste mud and replacement soil will be generated in the environment, causing environmental pollution, which does not meet the ecological and environmental protection requirements of the current urban comprehensive pipe gallery infrastructure construction
Although the U-shaped steel sheet pile has a good water-stop effect, its bending resistance is weak, and it cannot reliably support the lateral earth pressure of the foundation pit. Moreover, the existing U-shaped steel sheet piles are all front and back staggered splicing, and the area occupied Larger, this will cause the two sides of the steel sheet pile to be not on the same plane, and its inner and outer surfaces are concave and convex, which is very convenient for connecting I-beams or other components in the later stage, and if heavy equipment is erected on it, Its bearing capacity is relatively poor
[0005] For the construction process of the foundation pit of the pipe gallery, heavy equipment is required for the transportation of the soil in the foundation pit, the lifting and installation of the prefabricated pipe gallery, and the lifting and installation of the pipeline, and the ground outside the foundation pit of the general pipe gallery They are relatively narrow. Conventional truck cranes or crawler cranes need to stand on the ground outside the foundation pit for lifting. For narrow foundation pits, these ordinary lifting equipment cannot be used normally, so they are generally used in foundation pit enclosure. Gantry lifting equipment is erected above the structure, but the load-bearing capacity of the existing U-shaped steel sheet piles cannot meet the requirements
In addition, because the foundation pit of the pipe gallery generally extends relatively long, ordinary fixed gantry cranes are not suitable. The existing walking gantry cranes have track type and ordinary walking type. The ordinary walking gantry crane is not very smooth for the bottom The construction site is not suitable for the track-type gantry. It is necessary to lay the track first and then erect the gantry; the existing foundation pit enclosure structure is not very convenient when laying the track, especially when the steel sheet pile is laying the track. In addition, the gauge of the track is fixed, and it is very troublesome to disassemble and replace different tracks
Moreover, the width of the existing gantry cranes is fixed, but the width of the foundation pit of the pipe gallery will change due to the influence of the terrain or surrounding buildings. The foundation pits of different widths need to be erected with gantry cranes of different widths. The erection of the track, the gantry crane, and the disassembly and assembly of the track are more complicated, resulting in a significant increase in construction costs

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • Underground comprehensive pipe gallery construction equipment and method
  • Underground comprehensive pipe gallery construction equipment and method
  • Underground comprehensive pipe gallery construction equipment and method

Examples

Experimental program
Comparison scheme
Effect test

Embodiment Construction

[0051] The present invention will be further described below with reference to the accompanying drawings and embodiments. attached Figures 1 to 14 All are drawings of embodiments, drawn in a simplified manner, and are only used for the purpose of clearly and concisely illustrating the embodiments of the present invention. The following technical solutions shown in the drawings are specific solutions of the embodiments of the present invention, and are not intended to limit the scope of the claimed invention. Based on the embodiments of the present invention, all other embodiments obtained by those of ordinary skill in the art without creative efforts shall fall within the protection scope of the present invention.

[0052] In the description of the present invention, it should be understood that the orientations or positional relationships indicated by the terms "upper", "lower", "inner", "outer", "left", "right" etc. are based on those shown in the accompanying drawings. O...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to view more

PUM

PropertyMeasurementUnit
Lengthaaaaaaaaaa
Login to view more

Abstract

The invention provides underground comprehensive pipe gallery construction equipment and construction method. The construction equipment comprises a foundation pit enclosure structure, a rail connector, a walking steel rail, and a portal lifting device. The foundation pit enclosure structure is formed by meshing a plurality of composite piles formed by combining U-shaped steel sheet piles and H-shaped steel supporting columns side by side; the rail connector comprises a base and two sets of rail positioning adjusting elements symmetrically installed on the base; the bottom of the rail connector is connected with H-shaped steel supporting column webs of the composite piles; steel rails are installed on the rail connector; the portal lifting device comprises a fixed supporting leg, a span adjusting supporting leg, a bridge frame connected with the two supporting legs, and a walking mechanism; and the portal lifting device is in sliding connection with walking steel rails through the walking mechanism. According to the underground comprehensive pipe gallery construction equipment and construction method, foundation pit supporting and hoisting equipment are combined into a whole and fully utilized with each other, so that the integrity of a supporting system is enhanced, the occupied area of steel rail arrangement is reduced, environmental pollution is reduced, and all equipment can be recycled after engineering construction is completed.

Description

technical field [0001] The present invention relates to the construction field of underground comprehensive pipe gallery, in particular to a construction equipment and method for underground comprehensive pipe gallery. Purpose. Background technique [0002] Urban comprehensive utility corridor is a kind of urban infrastructure with the characteristics of modernization, scientization and intensification (Tan Zhongsheng, Chen Xueying, Wang Xiuying, etc. Construction management mode and key technology of urban underground comprehensive utility corridor[J]. Tunnel construction, 2016, 36(10): 1177.). It refers to the construction of public tunnels in the city's underground for the centralized laying of municipal pipelines such as power, communications, radio and television, water supply, drainage, heat, and gas, which is conducive to solving the problems of repeated excavation of roads, dense overhead line networks, Frequent pipeline accidents and other issues. As a municipal ...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to view more

Application Information

Patent Timeline
no application Login to view more
IPC IPC(8): E02D29/045
CPCE02D29/10
Inventor 陈斌肖玉成李春磊谢亮丁洪元
Owner WUHAN SURVEYING GEOTECHN RES INST OF MCC
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Try Eureka
PatSnap group products